The Directors present their report together with the interim financial report for the half-year ended 30 June
2024 and the independent auditor’s review report thereon, of Po Valley Energy Limited (“the Company” or “Po
Valley Energy” or “PVE”) and its subsidiary Po Valley Operations Pty Ltd (“PVO”) together referred to as “the
Group”.
Director details
The following persons were Directors of the Company during or since the end of the financial half-year:
Kevin Bailey AM – Chairman
Sara Edmonson - Non-Executive Director
Joseph Constable – Non-Executive Director
Katrina O’Leary – Non-Executive Director
•
•
•
•
Company Secretary
The Company Secretary during and since the end of the financial half-year was:
Kevin Hart
•
Principal Activities
The principal continuing activities of the Group in the course of the half-year were:
•
Production and sale of gas from the Podere Maiar 1 well
•
The exploration for gas and condensate in the Po Valley region of northern Italy
•
Appraisal and development of gas and oil fields in that footprint
Review and results of operations
Financial results for the period
The profit attributable to members of the Company for the half-year was €930,241 (30 June 2023: Loss
€399,260). The Group’s cash reserves as at 30 June 2024 were €3,114,319 (31 December 2023: €1,252,717).
A review of the operations and the results of those operations of the Group during the half-year is as follows:
Summary of results table:
Production volume (net)
30 June 2024
30 June 2023
Mcm
Mcm
8,153
€’000
€’000
Gas Sales
2,658
-
EBITDA
1,635
(356)
Depreciation and amortisation – production
(255)
-
Depreciation
(13)
(14)
Unwind of discount of restoration provision
(20)
-
EBIT
Finance costs other than restoration provision
discounting
Taxation
1,347
(370)
(4)
(29)
(413)
-
930
(399)
1
1
Net profit / (loss) after tax attributable to shareholders
1EBITDA (earnings before interest, tax, depreciation and depletion, exploration expensed and impairment losses) and EBIT (earnings before
interest and tax) are non-IFRS measures that are presented to provide an understanding of the Group’s operations. The non-IFRS measures
are unaudited, however, the numbers have been extracted from the financial statements that have been subject to audit review by the
Company’s auditor.
1
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
Selva Malvezzi Production Concession (63% PVO)
Selva is an onshore natural gas field located in the eastern part of the Po Plain, in the Bologna province of the
Emilia Romagna Region. The Selva Malvezzi Production Concession was awarded in July 2022 and measures
80.68km2. It includes the Podere Maiar Gas field (PM-1) (in production) and the gas prospects, known as East
Selva, Selva North and South and Riccardina; carved out from the former Podere Gallina Exploration Permit.
PVO (100% subsidiary of the Company) is the operator under a Joint Operating Agreement (“JOA”) and holds
a 63% interest in the Selva Malvezzi Production Concession with Prospex Oil and Gas Plc (“Prospex”) holding
37% (includes 20% held by Prospex subsidiary UOG Italia S.r.l).
PM-1 gas production and well management
Gas production at PVO’s 63%-owned Podere Maiar – 1 (PM-1) gas facility in the Selva Malvezzi Production
Concession for the quarter is shown in the table below:
PM1 Gas Production half year to 30 June 2024
Q1- 2024
Q2-2024
Total To 30 June2024
Production
scm
scm
scm
PM-1 – 100%
6,385,255
6,835,397
13,220,652
PM-1 – 63% (PVE share)
4,022,711
4,130,692
8,153,403
Revenue
€’000
€’000
€’000
PM-1 – 100%
1,907
2,311
4,218
PM-1 – 63% (PVE share)
1,202
1,456
2,658
PM-1 gas continues to be supplied to BP Gas Marketing under the original 18-month supply agreement which
has been extended for a further 12 months to 30 September 2025.
Production has been consistent throughout the period averaging ~78,000 scm to ~80,000 scm per day, with
the exception of days during which slick line operations were undertaken. Four slick line operations were
completed in the period with the final conducted in June. These operations re-confirmed field pressure
evolution are as per expectations with no sand or water detection. Three and a half days were allowed for
pressure buildup in the June slick line and the well was reopened on 20 June with production recommenced
at ~80,000 scm/day. Production is expected to continue at this rate for the foreseeable future. A surface sand
detector has now also been installed to enhance the monitoring of the PM-1 well.
Other Selva projects
The Selva Malvezzi Production Concession is the key area of focus for the Company with the next stages of
development at Selva North, South, Selva East and Riccardina prospects.
The Company continues to progress its work programme across these areas, including most imminently the
design, planning and permitting of the 3D seismic campaign over the whole Production Concession area.
Application for the 3D seismic ministerial authorisation was filed with the Italian Ministry on 19 June 2024.
In parallel, proposed drilling program planning, surface facilities design and environmental studies of new well
at Casale Guida 1d (North Selva), Ronchi 1d (South Selva), Selva Malvezzi 1d (East Selva) and Bagnarola 1d
2
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
(Riccardina), are in progress. The Company expects a drilling application will be submitted to the Italian
Ministry in Q3 2024.
Teodorico Offshore Gas field development (100% PVO)
The Teodorico gas field is located in shallow waters (approximately 30m deep) off the east coast of Italy in the
northern Adriatic Sea, the primary source of domestic gas production for much of Italy, and in close proximity
to existing east coast offshore gas production facilities. Teodorico has the largest gas-in-place of all of Po Valley
Energy’s gas fields and is at an advanced stage of assessment, ready for development. The Group holds a
preliminary production concession for this area and the Environmental Impact Assessment (“EIA”) decree for
Teodorico was granted in March 2021. The EIA is a precursor for the grant of a full production concession.
The Company continues to assess how best to realise value from its 100%-owned Teodorico (d.40.AC-PY) offshore asset, either via a joint venture or sale. Po Valley continues to investigate the New Energy Decree in
consultation with its legal advisers and the relevant Ministry, MASE, to determine its implications for
Teodorico. Given the decree is promoting domestic production citing the Northern Adriatic as a key source of
natural gas for the country, the ultimate impact on Teodorico is regarded as positive. However, the decree’s
details are still being worked through from an operational perspective.
Torre del Moro, Cadelbosco di Sopra and Grattasasso exploration licences (100% PVO)
The Company is reviewing optimal development paths for its residual assets (Cadelbosco di Sopra, Grattasasso
and Torre del Moro) including the potential for introduction of third-party investors / partners who have
interest in participating in their development.
Cadelbosco di Sopra and Grattasasso are shallow gas opportunities which fit neatly with the Company’s proven
exploration and development capabilities whilst Torre del Moro is a large deep gas prospect.
Significant events after balance date
There were no events between the end of the financial period and the date of this report that, in the opinion
of the Directors, affect significantly the operations of the Group, the results of those operations, or the state
of affairs of the Group, in subsequent financial periods.
Auditor’s independence declaration
A copy of the auditor’s independence declaration as required under section 307C of the Corporations Act 2001
is set out on page 4 and forms part of the Directors’ report for the half-year ended 30 June 2024.
This report has been made in accordance with a resolution of Directors.
Kevin Bailey AM
Chairman
12 September 2024
3
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the consolidated financial report of Po Valley Energy Limited for
the half-year ended 30 June 2024, I declare that to the best of my knowledge and belief, there have
been no contraventions of:
a)
the auditor independence requirements of the Corporations Act 2001 in relation to the review;
and
b)
any applicable code of professional conduct in relation to the review.
Perth, Western Australia
12 September 2024
L Di Giallonardo
Partner
4
PO VALLEY ENERGY LIMITED
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE SIX MONTHS ENDED 30 JUNE 2024
NOTE
30 June 2024
€
30 June 2023
€
Continuing Operations
4
5
2,657,510
(284,112)
(243,500)
-
5
(255,284)
-
Gross profit
1,874,614
-
Other income
80,439
146,742
(361,452)
(13,266)
(213,536)
(195,987)
(13,598)
(273,226)
1,366,799
(336,069)
359
(24,119)
6,118
(69,309)
(23,760)
(63,191)
1,343,039
(399,260)
(412,798)
-
930,241
(399,260)
-
-
930,241
(399,260)
0.08 € cents
(0.03) € cents
Revenue from contracts with customers
Cost of sales
Royalties
Depreciation and amortisation expense production
Employee benefits
Depreciation expense
Corporate overheads
Profit / (loss) from operating activities
6
Finance income
Finance expense
Net finance expense
7
Profit / (loss) before tax
Income tax expense
8
Profit / (loss) for the period
Other comprehensive income
Total comprehensive income / (loss) for the
period
Basic and diluted earnings / (loss) per share
from continuing operations
9
The accompanying notes from part of these financial statements
5
PO VALLEY ENERGY LIMITED
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 30 JUNE 2024
NOTE
Current Assets
Cash and cash equivalents
Trade and other receivables
30 June 2024
€
31 December 2023
€
3,114,319
705,738
1,252,717
691,719
Total current assets
3,820,057
1,944,436
Non-Current Assets
Inventory – non-current
Other assets
Deferred tax assets
Property, plant & equipment
Resource property costs
11,325
4,678
597,098
2,009,501
9,837,034
11,325
4,678
937,831
2,067,623
9,975,367
Total non-current assets
12,459,636
12,996,824
Total assets
16,279,693
14,941,260
697,189
24,851
4,557
296,251
24,851
4,557
726,597
325,659
994,671
87,660
974,991
100,086
1,082,331
1,075,077
Total Liabilities
1,808,928
1,400,736
Net Assets
14,470,765
13,540,524
56,847,751
1,192,269
(43,569,255)
56,847,751
1,299,983
(44,607,210)
14,470,765
13,540,524
Current Liabilities
Trade and other payables
Lease liabilities
Provisions
10
8
11
12
13
14
Total current liabilities
Non-Current Liabilities
Provisions
Lease liabilities
14
13
Equity
Issued capital
Reserves
Accumulated losses
15
16
Total Equity
The accompanying notes from part of these financial statements
6
PO VALLEY ENERGY LIMITED
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE SIX MONTHS ENDED 30 JUNE 2024
Issued Capital
€
56,632,102
Foreign
Currency
Translation
Reserve
€
1,192,269
Share Based
Payment
Reserve
€
Loss for the period
-
-
-
(399,260)
(399,260)
Other comprehensive income
-
-
-
-
-
Total comprehensive loss for the
period
-
-
-
(399,260)
(399,260)
155,711
-
-
155,711
(1,286)
-
-
-
(1,286)
61,225
-
(71,912)
10,687
-
Balance at 30 June 2023
56,847,752
1,192,269
107,714
(45,593,127)
12,554,608
Balance at 1 January 2024
Total comprehensive loss for the
period:
Profit for the period
56,847,751
1,192,269
107,714
(44,607,210)
13,540,524
-
-
-
930,241
930,241
Other comprehensive income
-
-
-
-
-
Total comprehensive income for
the period
-
-
-
930,241
930,241
Options expired
-
-
(107,714)
107,714
-
56,847,751
1,192,269
-
(43,569,255)
14,470,765
Balance at 1 January 2023
Total comprehensive loss for the
period:
Transactions with members
recorded directly in equity:
Issue of shares
Share issue costs
Transfer on exercise of options and
performance rights
Balance at 30 June 2024
Accumulated
Losses
€
179,626 (45,204,554)
Total
€
12,799,443
The accompanying notes from part of these financial statements
7
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE SIX MONTHS ENDED 30 JUNE 2024
30 June 2024
€
30 June 2023
€
Cash flows from operating activities
Receipts from customers
Receipts from joint operations partners
Payments to suppliers and employees
Interest received
Interest paid
2,531,510
92,496
(712,646)
359
-
77,822
(580,287)
6,118
(729)
Net cash from / (used in) operating activities
1,911,719
(497,076)
Cash flows from investing activities
Payments for property plant and equipment
Payments for resource property costs (net of joint
operation partner recoveries)
Refund of guarantee deposit for pipeline tie-in
-
584,460
(34,263)
-
(1,271,505)
476,910
Net cash used in investing activities
(34,263)
(210,135)
Cash flows from financing activities
Proceeds from issues of shares (net of issue costs)
Payments of lease liabilities
(14,340)
154,425
(13,799)
Net cash (used in) / from financing activities
(14,340)
140,626
Net increase / (decrease) in cash and cash equivalents
1,863,116
(566,585)
Cash and cash equivalents at 1 January
Exchange difference on cash and cash equivalents
1,252,717
(1,514)
1,536,041
(31,177)
Cash and cash equivalents at 30 June
3,114,319
938,279
The accompanying notes from part of these financial statements
8
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2024
NOTE 1: SUMMARY OF MATERIAL ACCOUNTING POLICIES
1.1
REPORTING ENTITY
Po Valley Energy Limited (“the Company” or “Po Valley Energy” or “PVE”) is a company domiciled in Australia.
The consolidated interim financial report for the six-month period ended 30 June 2024 comprises the Company
and its interests in subsidiaries and jointly controlled entities and operations (together referred to as “the
Group”).
The Group is primarily involved in the exploration, appraisal, development of, and production from, gas
properties in the Po Valley region in Italy and is a for profit entity.
1.2
BASIS OF PREPARATION
(a)
STATEMENT OF COMPLIANCE
The interim financial report is a condensed general purpose financial report prepared in accordance with AASB
134 Interim Financial Reporting and the Corporations Act 2001.
Selected explanatory notes are included to explain events and transactions that are significant to an
understanding of the changes in financial position and performance of the Group since the last annual
consolidated financial statements as at and for the year ended 31 December 2023. They do not include all of
the information required for a full annual financial report, and should be read in conjunction with the
consolidated annual financial report of the Group as at and for the year ended 31 December 2023 and with
any public announcements made by Po Valley Energy Limited during the half-year ended 30 June 2024.
The accounting policies and methods of computation adopted are consistent with those of the previous
financial year and corresponding half-year. These accounting policies are consistent with Australian
Accounting Standards and with International Financial Reporting Standards.
(b)
BASIS OF MEASUREMENT
These consolidated financial statements have been prepared on the basis of historical cost taking into
account, where appropriate, any value adjustments except for certain items required to be recognised at fair
value.
(c)
FUNCTIONAL AND PRESENTATION CURRENCY
The consolidated financial statements are presented in Euro, which is the Company’s and each of the Group
entities’ functional currency.
9
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2024
(d)
USE OF ESTIMATES AND JUDGEMENTS
The preparation of the financial statements requires management to make judgements, estimates
and assumptions that affect the application of accounting policies and the reported amounts of
assets, liabilities, income and expenses. Actual results may differ from these estimates.
Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting
estimates are recognised in the period in which the estimate is revised and in any future periods
affected.
The estimates and judgements that have a significant risk of causing a material adjustment to the
carrying amounts of assets and liabilities within the next financial year are discussed below.
Impairment of non-current assets
The ultimate recoupment of the value of resource property costs and property plant and equipment is
dependent on successful development and commercial exploitation, or alternatively, sale, of the
underlying properties. The Group undertakes at least on an annual basis, a comprehensive review for
indicators of impairment of these assets. Should an impairment indicator exist, the area of interest or
CGU is tested for impairment. There is significant estimation involved in determining the inputs and
assumptions used in determining the recoverability amounts.
The key areas of estimation involved in determining recoverable amounts include:
• Recent drilling results and reserves and resources estimates
• Environmental issues that may impact the underlying licences
• The estimated market value of assets at the review date
• Fundamental economic factors such as the gas price and current and anticipated operating
costs in the industry
• Future production rates
The post-tax discount rate used for impairment purposes is 10%.
Rehabilitation provisions
The value of these provisions represents the discounted value of the present obligations to restore,
dismantle and rehabilitate each well site under development or in production.
Significant estimation is required in determining the provisions for rehabilitation and closure as there
are many transactions and other factors that will affect ultimate costs necessary to rehabilitate the
sites. The discounted value reflects a combination of management’s best estimate of the cost of
performing the work required, the timing of the cash flows and the discount rate.
A change in any, or a combination of, the key assumptions used to determine the provisions could have
a material impact on the carrying value of the provisions.
The provision recognised for each site is reviewed at each reporting date and updated based on the
facts and circumstances available at that time. Changes to the estimated future costs for operating
sites are recognised in the statement of financial position by adjusting both the restoration and
rehabilitation asset and provisions.
The Group reviewed the provision at reporting date for works completed during development and
revised costs estimates for current prices and conditions to ensure provision is appropriate at the
reporting date. There were no changes to estimated costs during the period.
10
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2024
Reserve estimates
Estimation of reported recoverable quantities of Proven and Probable reserves include estimates
regarding commodity prices, exchange rates, discount rates, and production and transportation costs
for future cash flows. It also requires interpretation of complex geological and geophysical models in
order to make an assessment of the size, shape, depth and quality of reservoirs, and their anticipated
recoveries. The economic, geological and technical factors used to estimate reserves may change from
period to period.
A change in any, or a combination of, the key assumptions used to determine the reserve estimates
could have a material impact on the carrying value of the project via depreciation rates or impairment
assessments. The reserve estimates are reviewed at each reporting date and any changes to the
estimated reserves are recognised prospectively to depreciation and amortisation. Any impact of the
change in the reserves is considered on asset carrying values, and impairment losses, if any, are
immediately recognised in the profit or loss.
Recognition of deferred tax assets
The recoupment of deferred tax assets is dependent on the availability of profits in future years. The
Group undertakes a forecasting exercise at each reporting date to assess its expected utilisation of
these losses.
The key areas of estimation involved in determining the forecasts include:
•
Future production rates
•
Economic factors such as the gas price and current and anticipated operating costs in the industry
•
Capital expenditure expected to be incurred in the future
A change in any, or a combination of, the key assumptions used to determine the estimates could
have a material impact on the carrying value of the deferred tax asset. Changes to estimates are
recognised in the period in which they arise.
1.3
MATERIAL ACCOUNTING POLICIES
a)
New and revised Standards and Interpretations on issue not yet effective
Australian Accounting Standards and Interpretations that have recently been issued or amended but are not
yet effective have not been early adopted by the Group for the reporting period ended 30 June 2024. The
Directors do not believe that these new and revised Standards and Interpretations will have a material effect
on the Group.
b)
New Standards and Interpretations applicable for the six-month period ended 30 June 2024
The Directors have reviewed all the new and revised Standards and Interpretations issued by the AASB that
are relevant to the Group and effective for the current reporting period. As a result of this review, the Directors
have determined that there is no material impact of the new and revised Standards and Interpretations on the
Group and, therefore, no material change is necessary to the Group accounting policies.
11
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2024
NOTE 4: REVENUE
30 June 2024
€
Gas sales contract with customers
30 June 2023
€
2,657,510
-
Production operating costs
264,485
-
Capacity and transportation costs
19,627
-
Cash costs of production
284,112
-
Depreciation of plant and equipment
67,564
-
Depletion of resource property costs
187,720
-
Depreciation and amortisation expense
255,284
-
All gas sales are recorded as revenue at a point in time.
NOTE 5:
COST OF SALES
NOTE 6: PROFIT AND LOSS INFORMATION
Profit / (loss) for the half-year includes the following items:
Professional fees
(101,080)
(143,466)
Company administration and compliance
(69,234)
(85,845)
Travel costs
(13,393)
(20,451)
Interest income
359
6,118
Finance income
359
6,118
Interest expense
(1,914)
(3,473)
Unwind of discount on site restoration provision
(19,680)
(34,420)
Foreign exchange (gains) / losses (net)
(2,525)
(31,416)
Finance expense
(24,119)
(69,309)
Net finance expense
(23,760)
(63,191)
NOTE 7: FINANCE INCOME AND EXPENSE
Recognised in profit and loss:
12
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2024
NOTE 8: INCOME TAX EXPENSE
30 June 2024
€
30 June 2023
€
Current tax
Current year
72,065
-
Deferred tax expense
340,733
-
Total income tax expense
412,798
-
Deferred tax
Numerical reconciliation between aggregate tax expense recognised in the statement of comprehensive
income and tax expenses calculated per the statutory income tax rate:
Profit / (loss) for the year before tax from continuing operations
Income tax expensed / (benefit) using the Company’s domestic
tax rate of 30 % (2023: 26%)
1,343,039
(399,260)
402,912
(103,808)
Effect of tax rates in foreign jurisdictions
(92,757)
2,665
Permanent differences
(15,366)
-
Current year losses and temporary differences for which no
deferred tax asset was recognised
78,398
101,143
Changes in temporary differences
(32,454)
-
Foreign regional taxes payable
72,065
-
Income tax expense
412,798
-
Deferred tax assets have been recognised in respect of tax losses and temporary differences based on
management’s assessment that future taxable profit will be available against which the Group can utilise the
benefits therefrom. Deferred tax assets amounting to €597,098 (31 December 2023: €937,831) have been
recognised in relation to the Italian subsidiary’s available tax losses and temporary differences.
NOTE 9: EARNINGS / (LOSS) PER SHARE
30 June 2024
€ (cents)
Basic and diluted earnings / (loss) per share from continuing
operations
0.08
30 June 2023
€ (cents)
(0.03)
The calculation of basic and diluted earnings per share from continuing operations was based on the profit
attributable to members of €930,241 (2023: Loss €399,260) and a weighted average number of ordinary
shares outstanding during the half year of 1,158,961,620 (2023: 1,155,899,798).
13
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2024
NOTE 10: TRADE AND OTHER RECEIVABLES
30 June
2024
€
31 December
2023
€
Trade receivables
30,223
69,461
Indirect taxes receivable
183,039
251,343
Other receivables
14,476
18,915
Accrued revenue
478,000
352,000
Trade and other receivables
705,738
691,719
NOTE 11: PROPERTY, PLANT & EQUIPMENT
30 June
2024
€
Land – gas producing well site
Gas producing plant and equipment
At Cost
Accumulated depreciation
Office Furniture & Equipment:
At cost
Accumulated depreciation
Right-of-use asset: Building (Note 13)
At Cost
Accumulated depreciation
Total property plant & equipment
31 December
2023
€
52,100
52,100
1,959,612
(117,842)
1,936,904
(50,278)
1,841,770
1,886,626
29,666
(21,623)
29,666
(20,097)
8,043
9,569
148,678
(41,090)
148,678
(29,350)
107,588
119,328
2,009,501
2,067,623
14
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2024
NOTE 11: PROPERTY, PLANT & EQUIPMENT (continued)
6 Months to 30
June 2024
Year to 31
December 2023
€
€
Land – production well site
Carrying amount at beginning of period
Additions – reclassified from resource property costs
52,100
-
52,100
Carrying amount at end of period
52,100
52,100
Gas production plant and equipment
Carrying amount at beginning of period
Additions – reclassified from resource property costs
Additions
Depreciation expense
1,886,626
22,708
(67,564)
1,900,710
36,194
(50,278)
Carrying amount at end of period
1,841,770
1,886,626
Office furniture & equipment
Carrying amount at beginning of period
Additions
Written off
Depreciation expense
9,569
(1,526)
20,932
(7,495)
(3,868)
Carrying amount at end of period
8,043
9,569
Right-of-use assets
Carrying amount at beginning of year
Remeasurement of lease arrangement
Depreciation expense
119,328
(11,740)
135,014
7,794
(23,480)
Carrying amount at end of period
107,588
119,328
2,009,501
2,067,623
30 June 2024
€
31 December
2023
€
4,783,041
4,733,654
-
-
5,053,993
5,241,713
9,837,034
9,975,367
Reconciliations:
Reconciliation by class of property plant and equipment:
NOTE 12: RESOURCE PROPERTY COSTS
Resource Property costs
Exploration and evaluation phase
Development phase
Production phase
15
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2024
NOTE 12: RESOURCE PROPERTY COSTS (continued)
6 Months to 30
June 2024
Year to 31
December 2023
4,733,654
4,661,672
Expenditure during the period
49,387
71,982
Transfer to development phase
-
-
4,783,041
4,733,654
Carrying amount at beginning of period
-
6,736,926
Transfer from exploration and evaluation phase
-
-
Development expenditure
-
1,191,140
Transfer to production phase
-
(7,928,066)
Carrying amount at end of period
-
-
5,241,713
-
Transfer from development phase
-
7,928,066
Additions
Reclassified to property, plant & equipment (Gas
producing assets and well site land)
-
1,612
-
(1,952,810)
Reclassified as inventory
Impact of changes to rehabilitation and restoration
provisions
-
(11,325)
-
(584,139)
(187,720)
(139,691)
5,053,993
5,241,713
Reconciliation of carrying amount of resource properties
Exploration and Evaluation Phase
Carrying amount at beginning of period
Carrying amount at end of period
Development Phase
Production Phase
Carrying amount at beginning of period
Amortisation
Resource property costs in the exploration phase comprise the carrying value of its exploration and predevelopment projects. The ultimate recoupment of resource property costs is dependent upon the
successful development and exploitation, or alternatively sale, of the respective areas of interest at an
amount greater than or equal to the carrying value. Where activities in the area of interest have, at the
reporting date, reached a stage which permits a reasonable assessment of the existence or otherwise of
economically recoverable reserves, the exploration and evaluation assets are assessed for impairment.
Impairment will occur if sufficient data exists to determine technical feasibility and commercial viability
and the facts and circumstances suggest that the carrying amount exceeds the recoverable amount.
Resource property costs in the development phase comprise the carrying value of the development costs
for areas that have reached the stage of reasonable assessment of economically recoverable reserves and
have attained required permits and approvals to develop into a producing field.
16
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2024
NOTE 12: RESOURCE PROPERTY COSTS (continued)
Resource property costs in the production phase comprise the carrying value of the Group’s production
projects that have reached the completion of development and are ready for or have commenced
production of gas having attained the required permits and approvals.
The Group assessed eac