Half Year Accounts
Released
Released
Announcement PDF
PO VALLEY ENERGY LIMITED
A.B.N. 33 087 741 571
INTERIM FINANCIAL REPORT FOR THE
SIX MONTHS ENDED 30 JUNE 2023
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
The Directors present their report together with the interim financial report for the half-year ended 30 June
2023 and the independent auditor’s review report thereon, of Po Valley Energy Limited (“the Company” or “Po
Valley Energy” or “PVE”) and its subsidiary Po Valley Operations Pty Ltd (“PVO”) together referred to as “the
Group”.
Director details
The following persons were Directors of the Company during or since the end of the financial half-year:
•
•
•
•
Kevin Bailey AM – Chairman (Non-Executive Director since 3 May 2016, appointed as Chairman 2 May
2022)
Sara Edmonson - Non-Executive Director (since 23 December 2019)
Joseph Constable – Non-Executive Director (since 30 November 2021)
Katrina O’Leary – Non-Executive Director (appointed 2 May 2022)
Company Secretary
The Company Secretary during and since the end of the financial half-year was:
•
Kevin Hart
Principal Activities
The principal continuing activities of the Group in the course of the half-year were:
•
The exploration for gas and oil in the Po Valley region of northern Italy
•
Appraisal and development of gas and oil fields in that footprint
Review and results of operations
Financial results for the period
The loss attributable to members of the Company for the half-year was €399,260 (30 June 2022: €374,492).
The Group’s cash reserves as at 30 June 2023 were €938,279 (31 December 2022: €1,536,041).
The Company issued 5,000,000 shares on the exercise of options during the half-year at an exercise price of
AU$0.05 (~€0.031) per share raising €155,711 (before costs).
3,000,000 shares were issued on exercise of performance rights during the half-year. The performance rights
had a Nil exercise price.
Selva Malvezzi Production Concession (63% PVO)
Selva Malvezzi is an onshore natural gas field located in the eastern part of the Po Valley plain spanning the
Ferrara and Bologna provinces, within the Emilia Romagna Region. The production concession covers an area
of 80.68 sq km. This concession was previously known as Podere Gallina Exploration Permit which is now
reclassified as the Selva Malvezzi production concession incorporating the Podere Maiar-1 well, Selva North
and South Prospects, Selva East prospect and the Riccardina prospect.
In February 2023, the Group, through its wholly owned subsidiary, PVO, entered into a Gas Sales Agreement
(GSA) with BP Gas Marketing Limited (BPGM). The agreement was established in preparation of the
completion of construction and commissioning of the gas plant facility at Podere Maiar-1. The contract with
BPGM is an 18-month contract by which PVO will supply an estimated 37,000,000 standard cubic meters of
gas at a pricing structure tide to Italy’s “Heren PSV day ahead mid” price.
1
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
Construction of the gas plant and pipeline at Podere Maiar-1 including the connection to the Italian grid at the
SNAM connection point, was successfully completed during the half-year. The performance bond of €757,000
(63% to PVO €476,910) initially deposited with SNAM at the commencement of the PM-1 development was
returned to the Group following the successful completion of the pipeline tie-in to the PM-1 gas plant and
having satisfied the condition of a GSA being in place. Construction and grid connection of PM-1 was
completed largely on schedule and within 3% of budget.
Preparations for commissioning of the gas plant were concluded late in June 2023, following the grant of final
approvals for gas production (refer ASX announcement 28 June 2023). After these final approvals, a mandatory
8-day period was required to finalise all administrative matters before production could commence.
Production commenced on 4 July 2023 with the four-week ramp up and commissioning programme completed
during the first week of August 2023.
Teodorico Offshore Gas field development (100% PVO)
The Teodorico gas field is located in shallow waters (approximately 30m deep) off the east coast in the
northern Adriatic Sea; the primary source of domestic gas production for much of Italy; and in close proximity
to existing east coast offshore gas production facilities. Teodorico has the largest gas-in-place of all of Po Valley
Energy’s gas fields and is at an advanced stage of assessment, ready for development. The Group holds a
preliminary production concession for this area and the Environmental Impact Assessment (“EIA”) decree for
Teodorico was granted in March 2021. The EIA is a precursor for the grant of a full production concession.
PVE has sought guidance from the Italian Ministry regarding the impact of Italy’s Plan of Sustainable Energy
Transition of Suitable Areas (“Pitesai”) on Teodorico due to the institution of environmental protected areas
in proximity of the licence, particularly as the preliminary production concession was attained before the
Pitesai process began in February 2019. PVO received the required Teodorico EIA approval before the Pitesai
process commenced and the field reserves (2P 36.5bcf) are in excess of thresholds required for continuation
(5.3bcf).
In conjunction with the considerations above, PVE is exploring mechanisms to realise value at Teodorico via
joint-venture or asset sale.
Torre del Moro, Cadelbosco di Sopra and Grattasasso exploration licences (100% PVO)
The Company is reviewing optimal development paths for these residual assets including introduction of thirdparty investors/partners who have interest in participating in their development.
Cadelbosco di Sopra and Grattasasso are shallow gas opportunities which fit neatly with the Company’s proven
exploration and development capabilities whilst Torre del Moro is a large deep gas prospect.
Significant events after balance date
Subsequent to the balance date, production at Podere Maiar-1 commenced on 4th July 2023, with the 4-week
ramp-up and commissioning period completed during the week ending 4th August 2023. The ramp-up and
commissioning process progressed seamlessly concluding with a three-day shut down and removal of memory
gauges from the C2 production zone. On the last day of the shut down period, a slick line rig attended site to
complete the work programme and obtain pressure / temperature gradient data. Data analysis is currently
underway and production recommenced. During the ramp-up period, approximately 1,800,000 standard cubic
meters (scm) of gas was produced, all of which was sold to BPGM under the 18-month GSA. Initial gas
production cash flows were received before the end of August 2023.
2
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
Initial production, results of the data analysis and ongoing stable gas production will have a significant impact
on the Group’s operations.
Auditor’s independence declaration
A copy of the auditor’s independence declaration as required under section 307C of the Corporations Act 2001
is set out on page 4 and forms part of the Directors’ report for the half-year ended 30 June 2023.
This report has been made in accordance with a resolution of Directors.
Kevin Bailey AM
Chairman
11 September 2023
3
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the consolidated financial report of Po Valley Energy Limited for
the half-year ended 30 June 2023, I declare that to the best of my knowledge and belief, there have
been no contraventions of:
a)
the auditor independence requirements of the Corporations Act 2001 in relation to the review;
and
b)
any applicable code of professional conduct in relation to the review.
Perth, Western Australia
11 September 2023
L Di Giallonardo
Partner
4
PO VALLEY ENERGY LIMITED
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
FOR THE SIX MONTHS ENDED 30 JUNE 2023
NOTE
30 June 2023
€
30 June 2022
€
Continuing Operations
Other income
146,742
57,475
Employee benefits
Depreciation expense
Corporate overheads
Share based payment expense
(195,987)
(13,598)
(273,226)
-
(175,369)
(335)
(195,296)
(2,547)
(336,069)
(316,072)
6,118
(69,309)
257
(58,677)
(63,191)
(58,420)
(399,260)
(374,492)
-
-
(399,260)
(374,492)
-
-
(399,260)
(374,492)
(0.03) € cents
(0.04) € cents
Loss from operating activities
2
Finance income
Finance expense
Net finance expense
3
Loss before income tax
Income tax benefit
4
Loss for the period
Other comprehensive income
Total comprehensive loss for the period
Basic and diluted (loss) per share from
continuing operations
5
The accompanying notes from part of these financial statements
5
PO VALLEY ENERGY LIMITED
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
AS AT 30 JUNE 2023
NOTE
Current Assets
Cash and cash equivalents
Trade and other receivables
Other assets
30 June 2023
€
31 December 2022
€
938,279
825,691
-
1,536,041
434,480
476,910
1,763,970
2,447,431
12,238
1,120,413
2,043,058
10,707,502
13,178
1,120,413
155,946
11,398,598
Total non-current assets
13,883,211
12,688,135
Total assets
15,647,181
15,135,566
1,474,388
28,406
4,468
741,384
22,112
4,387
1,507,262
767,883
1,485,248
100,063
1,450,828
117,412
1,585,311
1,568,240
Total Liabilities
3,092,573
2,336,123
Net Assets
12,554,608
12,799,443
56,847,752
1,299,983
(45,593,127)
56,632,102
1,371,895
(45,204,554)
12,554,608
12,799,443
6
Total current assets
Non-Current Assets
Other assets
Deferred tax assets
Property, plant & equipment
Resource property costs
4
7
8
Equity and liabilities
Current Liabilities
Trade and other payables
Lease liabilities
Provisions
9
10
Total current liabilities
Non-Current Liabilities
Provisions
Lease liabilities
10
9
Equity
Issued capital
Reserves
Accumulated losses
11
12
Total Equity
The accompanying notes from part of these financial statements
6
PO VALLEY ENERGY LIMITED
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE SIX MONTHS ENDED 30 JUNE 2023
Share Capital
€
Foreign
Currency
Translation
Reserve
€
Share Based
Payment
Reserve
€
52,719,884
1,192,269
Loss for the period
-
-
Other comprehensive income
-
Total comprehensive loss for the
period
Accumulated
Losses
€
Total
€
10,687
(44,220,840)
9,702,000
-
-
(374,492)
-
(374,492)
-
-
-
-
(374,492)
(374,492)
1,180,454
(6,681)
-
-
1,180,454
(6,681)
-
-
2,547
-
2,547
Balance at 30 June 2022
53,893,657
1,192,269
13,234
(44,595,332)
10,503,828
Balance at 1 January 2023
Total comprehensive loss for the
period:
Loss for the period
56,632,102
1,192,269
179,626
(45,204,554)
12,799,443
-
-
-
(399,260)
(399,260)
Other comprehensive income
-
-
-
-
-
Total comprehensive loss for the
period
-
-
-
(399,260)
(399,260)
Issue of shares
155,711
-
-
-
155,711
Share issue costs
Transfer on exercise of options and
performance rights
(1,286)
-
-
-
(1,286)
61,225
-
(71,912)
10,687
-
56,847,752
1,192,269
107,714
(45,593,127)
12,554,608
Balance at 1 January 2022
Total comprehensive loss for the
period:
Transactions with members
recorded directly in equity:
Issue of shares
Share issue costs
Share based payments
Transactions with members
recorded directly in equity:
Balance at 30 June 2023
The accompanying notes from part of these financial statements
7
CONSOLIDATED STATEMENT OF CASH FLOWS
FOR THE SIX MONTHS ENDED 30 JUNE 2023
30 June 2023
€
30 June 2022
€
Cash flows from operating activities
Receipts from joint operations partners
Payments to suppliers and employees
Interest received
Interest paid
77,822
(580,287)
6,118
(729)
78,582
(400,961)
257
(30,314)
Net cash (used in) operating activities
(497,076)
(352,436)
584,460
188,374
(1,271,505)
476,910
(469,499)
-
Net cash (used in) investing activities
(210,135)
(281,125)
Cash flows from financing activities
Proceeds from issues of shares (net of issue costs)
Payments of lease liabilities
154,425
(13,799)
(6,681)
-
Net cash (used in) / provided by financing activities
140,626
(6,681)
Net decrease in cash and cash equivalents
(566,585)
(640,242)
Cash and cash equivalents at 1 January
1,536,041
(31,177)
1,262,151
33,953
938,279
655,862
Cash flows from investing activities
Receipts for resource property costs from joint
operations partners
Payments for resource property costs and gas
producing property plant and equipment
Refund of SNAM bond
Exchange difference on cash and cash equivalents
Cash and cash equivalents at 30 June
The accompanying notes from part of these financial statements
8
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2023
NOTE 1: SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
1.1
REPORTING ENTITY
Po Valley Energy Limited (“the Company” or “Po Valley Energy” or “PVE”) is a company domiciled in Australia.
The consolidated interim financial report for the six-month period ended 30 June 2023 comprises the Company
and its interests in subsidiaries, associates and jointly controlled entities and operations (together referred to
as “the Group”).
The Group is primarily involved in the exploration, appraisal, development of, and production from, gas
properties in the Po Valley region in Italy and is a for profit entity.
1.2
BASIS OF PREPARATION
(a)
STATEMENT OF COMPLIANCE
The interim financial report is a condensed general purpose financial report prepared in accordance with AASB
134 Interim Financial Reporting and the Corporations Act 2001.
Selected explanatory notes are included to explain events and transactions that are significant to an
understanding of the changes in financial position and performance of the Group since the last annual
consolidated financial statements as at and for the year ended 31 December 2022. They do not include all of
the information required for a full annual financial report, and should be read in conjunction with the
consolidated annual financial report of the Group as at and for the year ended 31 December 2022 and with
any public announcements made by Po Valley Energy Limited during the half-year ended 30 June 2023.
The accounting policies and methods of computation adopted are consistent with those of the previous
financial year and corresponding half-year. These accounting policies are consistent with Australian
Accounting Standards and with International Financial Reporting Standards.
(b)
BASIS OF MEASUREMENT
These consolidated financial statements have been prepared on the basis of historical cost taking into
account, where appropriate, any value adjustments except for certain items required to be recognised at fair
value.
(c)
GOING CONCERN
The financial report has been prepared on the going concern basis, which contemplates the continuity of
normal business activity and the realisation of assets and the settlement of liabilities in the normal course of
business.
Notwithstanding the loss generated by the Group during the period, the Directors believe that the future cash
flows generated by the operations of the Podere Maiar-1 well, which began production on 4th July 2023, will
enable the Group to continue its normal activities and settle its liabilities in the normal course of business.
(d)
FUNCTIONAL AND PRESENTATION CURRENCY
The consolidated financial statements are presented in Euro, which is the Company’s and each of the Group
entities’ functional currency.
9
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2023
(e)
USE OF ESTIMATES AND JUDGEMENTS
The preparation of the financial statements requires management to make judgements, estimates and
assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities,
income and expenses. The Company based its assumptions and estimates on parameters available when the
financial statements were prepared. Existing circumstances and assumptions about future developments,
however, may change due to market change or circumstances arising beyond the control of the Company.
Actual results may differ from these estimates.
Estimates and underlying assumptions are based on complex or subjective judgments and past experience of
other assumptions deemed reasonable in consideration of the information available at the time and are
reviewed on an ongoing basis. Revisions to accounting estimates are recognised in the period in which the
estimate is revised and in any future periods affected.
The estimates and judgements that have a significant risk of causing a material adjustment to the carrying
amounts of assets and liabilities within the next financial year are discussed below.
Impairment of non-current assets
The ultimate recoupment of the value of resource property costs and property plant and equipment is
dependent on successful development and commercial exploitation, or alternatively, sale, of the underlying
properties. The Group undertakes at least on an annual basis, a comprehensive review for indicators of
impairment of these assets. Should an impairment indicator exist, the area of interest or CGU is tested for
impairment. There is significant estimation involved in determining the inputs and assumptions used in
determining the recoverable amounts.
The key areas of estimation involved in determining recoverable amounts include:
• Recent drilling results and reserves and resources estimates
• Environmental issues that may impact the underlying licences
• The estimated market value of assets at the review date
• Fundamental economic factors such as the gas price and current and anticipated operating costs in the
industry
• Future production rates
The post-tax discount rate used for impairment purposes is 10%.
Rehabilitation provisions
The value of these provisions represents the discounted value of the present obligations to restore, dismantle
and rehabilitate each well site under development or in production. Significant estimation is required in
determining the provisions for rehabilitation and closure as there are many transactions and other factors that
will affect ultimate costs necessary to rehabilitate the sites. The discounted value reflects a combination of
management’s best estimate of the cost of performing the work required, the timing of the cash flows and the
discount rate.
A change in any, or a combination of, the key assumptions used to determine the provisions could have a
material impact on the carrying value of the provisions. The provision recognised for each site is reviewed at
each reporting date and updated based on the facts and circumstances available at that time. Changes to the
estimated future costs for operating sites are recognised in the statement of financial position by adjusting
both the restoration and rehabilitation asset and provision.
10
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2023
Reserve estimates
Estimation of reported recoverable quantities of Proven and Probable reserves include estimates regarding
commodity prices, exchange rates, discount rates, and production and transportation costs for future cash
flows. It also requires interpretation of complex geological and geophysical models in order to make an
assessment of the size, shape, depth and quality of reservoirs, and their anticipated recoveries. The economic,
geological and technical factors used to estimate reserves may change from period to period.
A change in any, or a combination of, the key assumptions used to determine the reserve estimates could have
a material impact on the carrying value of the project via depreciation rates or impairment assessments. The
reserve estimates are reviewed at each reporting date and any changes to the estimated reserves are
recognised prospectively to depreciation and amortisation. Any impact of the change in the reserves is
considered on asset carrying values and impairment losses, if any, are immediately recognised in the profit or
loss.
Recognition of deferred tax assets
The recoupment of deferred tax assets is dependent on the availability of profits in future years. The Group
undertakes a forecasting exercise at each reporting date to assess its expected utilisation of these losses.
The key areas of estimation involved in determining the forecasts include:
•
Future production rates
•
Economic factors such as the gas price and current and anticipated operating costs in the industry
•
Capital expenditure expected to be incurred in the future
A change in any, or a combination of, the key assumptions used to determine the estimates could have a
material impact on the carrying value of the deferred tax asset. Changes to estimates are recognised in the
period in which they arise.
1.3
SIGNIFICANT ACCOUNTING POLICIES
a)
New and revised Standards and Interpretations on issue not yet effective
Australian Accounting Standards and Interpretations that have recently been issued or amended but are not
yet effective have not been early adopted by the Group for the reporting period ended 30 June 2023. The
Directors do not believe that these new and revised Standards and Interpretations will have a material effect
on the Group.
b)
New Standards and Interpretations applicable for the six-month period ended 30 June 2023
The Directors have reviewed all the new and revised Standards and Interpretations issued by the AASB that
are relevant to the Group and effective for the current reporting period. As a result of this review, the Directors
have determined that there is no material impact of the new and revised Standards and Interpretations on the
Group and, therefore, no material change is necessary to the Group accounting policies.
11
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2023
NOTE 2: PROFIT AND LOSS INFORMATION
Loss for the half-year includes the following items:
30 June 2023
€
(143,466)
(85,845)
(20,451)
30 June 2022
€
(93,903)
(67,094)
(4,190)
Recognised in profit and loss:
Interest income
6,118
257
Finance income
6,118
257
Interest expense
(3,473)
(30,315)
Net effective interest from rehabilitation provisions (Note 10)
(34,420)
-
Foreign exchange (gains) / losses (net)
(31,416)
(28,362)
Finance expense
(69,309)
(58,677)
Net finance expense
(63,191)
(58,420)
Professional fees
Company administration and compliance
Travel costs
NOTE 3: FINANCE INCOME AND EXPENSE
NOTE 4: INCOME TAX EXPENSE
Numerical reconciliation between aggregate tax expense recognised in the statement of comprehensive
income and tax expenses calculated per the statutory income tax rate
30 June 2023
30 June 2022
€
€
Loss for the year before tax
Income tax expensed / (benefit) using the Company’s domestic
tax rate of 26 % (2022: 26%)
Effect of tax rates in foreign jurisdictions
Current year losses and temporary differences for which no
deferred tax asset was recognised
Income tax (benefit)
(399,260)
(374,492)
(103,808)
2,665
(97,368)
3,000
101,143
-
94,368
-
Deferred tax assets have been recognised in respect of tax losses and temporary differences based on
management’s assessment that future taxable profit will be available against which the Group can utilise the
benefits therefrom. Deferred tax assets amounting to €1,120,413 (31 December 2022: €1,120,413) have been
recognised in relation to the Italian subsidiary’s available tax losses and temporary differences.
12
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2023
NOTE 5: (LOSS) PER SHARE
30 June 2023
€ (cents)
Basic and diluted (loss) per share from continuing operations
(0.03)
30 June 2022
€ (cents)
(0.04)
The calculation of basic and diluted loss per share from continuing operations was based on the loss
attributable to members of €399,260 (2022: €374,492) and a weighted average number of ordinary shares
outstanding during the half year of 1,155,899,798 (2022: 1,027,016,368).
NOTE 6: TRADE AND OTHER RECEIVABLES
30 June 2023
€
31 December
2022
€
Trade receivables
343,842
211,793
Indirect taxes receivable
422,929
185,053
Other receivables
58,920
37,634
Trade and other receivables
825,691
434,480
NOTE 7: PROPERTY, PLANT & EQUIPMENT
Gas producing plant and equipment
At Cost
Accumulated depreciation
Office Furniture & Equipment:
At cost
Accumulated depreciation
Carrying amount at end of period
Right-of-use asset: Building (Note 9)
At Cost
Accumulated depreciation
Total property plant & equipment
30 June 2023
€
31 December
2022
€
1,900,710
-
-
1,900,710
-
39,707
(20,632)
39,707
(18,775)
19,075
20,932
140,884
(17,611)
140,884
(5,870)
123,273
135,014
2,043,058
155,946
13
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2023
NOTE 7: PROPERTY, PLANT & EQUIPMENT (continued)
Reconciliations:
Property plant and equipment:
Gas production plant and equipment
Carrying amount at beginning of period
Additions – reclassified from resource property costs
Depreciation expense
6 Months to 30
June 2023
Year to 31
December 2022
€
€
1,900,710
-
-
1,900,710
-
Office furniture & equipment
Carrying amount at beginning of period
Additions
Depreciation expense
20,932
(1,857)
7,021
16,600
(2,689)
Carrying amount at end of period
19,075
20,932
Right-of-use assets
Carrying amount at beginning of year
Additions right-of-use assets
Depreciation expense
135,014
(11,741)
140,884
(5,870)
Carrying amount at end of period
123,273
135,014
2,043,058
155,946
30 June 2023
€
31 December
2022
€
4,680,146
4,661,672
-
6,736,926
6,027,356
-
10,707,502
11,398,598
NOTE 8: RESOURCE PROPERTY COSTS
Resource Property costs
Exploration and evaluation phase
Development phase
Production phase
14
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2023
NOTE 8: RESOURCE PROPERTY COSTS (continued)
6 Months to 30
June 2023
Year to 31
December 2022
4,661,672
8,146,546
18,474
430,021
Exploration written off
-
-
Transfer to development phase
-
(3,914,895)
4,680,146
4,661,672
6,736,926
-
-
3,914,895
1,191,140
1,371,203
-
1,450,828
(7,928,066)
-
-
6,736,926
-
-
7,928,066
-
(1,900,710)
-
6,027,356
-
Reconciliation of carrying amount of resource properties
Exploration Phase
Carrying amount at beginning of period
Expenditure during the period
Carrying amount at end of period
Development Phase
Carrying amount at beginning of period
Transfer from exploration and evaluation phase
Development expenditure
Restoration and rehabilitation asset
Transfer to production phase
Carrying amount at end of period
Production Phase
Carrying amount at beginning of period
Transfer from development phase
Reclassified to property, plant & equipment (Gas
producing assets)
Resource property costs in exploration phase comprise the carrying value of its exploration and predevelopment projects. The ultimate recoupment of resource property costs is dependent upon the
successful development and exploitation, or alternatively sale, of the respective areas of interest at an
amount greater than or equal to the carrying value. Where activities in the area of interest have, at the
reporting date, reached a stage which permits a reasonable assessment of the existence or otherwise of
economically recoverable reserves, the exploration and evaluation assets are assessed for impairment.
Impairment will occur if sufficient data exists to determine technical feasibility and commercial viability
and the facts and circumstances suggest that the carrying amount exceeds the recoverable amount.
Resource property costs in the development phase comprise the carrying value of the development costs
for areas that have reached the stage of reasonable assessment of economically recoverable reserves and
have attained required permits and approvals to develop into a producing field.
15
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2023
NOTE 8: RESOURCE PROPERTY COSTS (continued)
Resource property costs in the production phase comprise the carrying value of the Group’s production
projects that have reached the completion of development and are ready for or have commenced
production of gas having attained the required permits and approvals.
Following a review by management, no impairment has been recognised for the 6 months to 30 June 2023.
NOTE 9: LEASES
Leases as lessee
The Group leases office facilities in Rome under a new lease agreement. The lease runs for a period of six
years from the start of the lease in October 2022.
Information about leases for which the Group is a lessee is presented below.
Right-of-use assets (Note 7):
Buildings
Balance at 1 January
Additions to right-of-use assets (new leases)
Depreciation
Total
Amounts recognised in profit and loss:
Interest on lease liabilities
Amounts recognised in statement of cash flows:
Payment of lease liabilities
6 Months to 30
June 2023
€
Year to 31
December 2022
€
135,014
(11,741)
123,273
140,884
(5,870)
135,014
6 Months to 30
June 2023
€
2,744
6 Months to 30
June 2022
€
6 Months to 30
June 2023
€
13,799
6 Months to 30
June 2022
€
-
-
Lease liabilities:
Lease liabilities are presented in the statement of financial position separately within liabilities as follows:
31 December
30 June 2023
2022
€
€
Lease liabilities – current
28,406
22,112
Lease liabilities – non-current
100,063
117,412
128,469
139,524
16
PO VALLEY ENERGY LIMITED
NOTES TO THE INTERIM FINANCIAL REPORT
FOR THE SIX MONTHS ENDED 30 JUNE 2023
NOTE 9: LEASES (continued)
Future minimum lease payments at 30 June were as follows:
Within one
One to five
year
years
€
€
Lease payments
27,600
103,500
Finance charges
(4,609)
(9,032)
Net Present values
22,991
After 5 years
€
94,468
-
Total
€
131,100
(13,641)
-
117,459
Lease payments not recognised as a liability
The Group has elected not to recognise a lease liability for short term leases (leases with
Share your feedback