AGM Presentation
Released
Released
Announcement PDF
Annual General Meeting
31 May 2016
1
Achievements and Challenges in 2015 and YTD
Achievements
• Debt Reduced from € 3.4m as at December 2014 to €450k as at 31 May 2016
• Sale of La Prospera license (Gradizza gas discovery) for €1.85m (plus VAT) in 4Q15
• Completed permiOng process for the Bezzecca pipeline installaRon
• Advanced Teodorico offshore gas field toward preliminary producRon concession award
• Advanced Selva to drilling approval
• Reduced administraRon and corporate costs
• RecapitalisaRon through $1.75m right issue
Challenges
• Lower gas prices
• Decline in Sillaro producRon (and workover delays)
• Regulatory changes to offshore boundaries (Teodorico)
2
Strategic Priorities: Production and Growth
Po Valley Energy
Produc;on
(NSI)
Growth
(PVO)
1.
2.
Complete Sillaro workover
Bezzecca into producRon
1.
Grant of Teodorico
preliminary producRon concession
3.
Sant Alberto into producRon
2.
3.
Drill high IRR Selva gas field
Grant of Torro de Morro
3
Bezzecca field (Cascina Castello Concession – 90% PVE)
• Bezzecca: on shore gas (4.2bcf-2P)*
• Bezzecca-1 successfully drilled and
tested in 2009. Tested up to 62,900
scm/day
• 50,000 Scm/day combined flow. Total
revenue esRmated to be over €29
million in 8 years
• Bezzecca gas feeds into exisRng
Castello (Vitalba) plant
• The pipeline and development is fully
authorized
* Cer&fied by Robertson CGG , refer to slide 10 for more informa&on
4
Selva onshore gas field
• Selva: onshore gas (17 bcf–2C)*
• G&G work carried out in 2012 to assess the
residual potenRal of the Selva gas field (84
bcf already produced)
EAST SELVA
(exploration target)
• Reservoir quality is excellent. Selva was
ranked in the top 5 best performing
reservoirs in Eni’s producRon history
• License holds two targets: a low risk
volume up dip of abandoned producers
(named “Selva StraRgraphic”) and a second
exploraRon target on the pinch out edge to
the east of the main Selva field
SELVA STRATIGRAPHIC
(development target)
• Drilling approval expected 3Q 2016
* Cer&fied by Robertson CGG, refer to slide 10 for more informa&on
5
Teodorico offshore gas field
New concession area as at May 2016
•
Teodorico: offshore gas (~ 50 bcf-2C)*
•
The applicaRon was reviewed by the
technical commiiee of the Ministry
of Economic Development in
November 2015.
•
•
On 23 December 2015, the Italian
parliament approved legislaRve
changes re-introducing the 12 nauRcal
mile moratorium
Production well
Naomi Pandora
gas processing
facility
Tie in pipeline
12 nautical mile limit
Development of Teodorico gas field is
within the permiied area
* Cer&fied by Robertson CGG , refer to slide 10 for more informa&on
6
Information Required by ASX Chapter 5 Listing Rules
All the reserves and resources referred to in this presentaRon are as reported in the Company’s
2015 Annual Report lodged with ASX on 29 April 2016. Please refer to the Annual Report for full
details of the Company’s reserves and resources as at 31 December 2015 and details of the
independent evaluaRon of those esRmates.
All esRmates have been determined using a probabilisRc method except for Sillaro, Vitalba,
Bezzecca, Sant’Alberto and Fantuzza, which were determined using a determinisRc method;
The reference point for gas flow from Vitalba & Sillaro is measured through a turbine, located on
the wells site, using non standard cubic metres. The figure is standardized using a FiorenRni
Fiomec Calculator (FFC) which is a conversion consisRng of gas temperature and pressure with
gas quality parameters. The outcome of this conversion is the actual gas volume in standard
cubic meters injected in the SNAM gridline. (SNAM is an Italian natural gas infrastructure
company and manages the naRonal gas transportaRon network). The SNAM entry points for
Sillaro & Vitalba are located 200 metres and 50 metres respecRvely from site perimeters. The
FFC prints a producRon report which is authenRcated by the Ministry of Economic Development
and this official data is then accepted by SNAM, our customers and the Tax AuthoriRes.
The Company confirms that it is not aware of any new informaRon or data that materially affects
the informaRon included in the Company’s 2015 Annual Report and that all material
assumpRons and technical parameters underpinning the esRmates in that Annual Report
conRnue to apply and have not materially changed.
7
Share your feedback
Discover