PO VALLEY ENERGY LIMITED
A.B.N. 33 087 741 571
CONSOLIDATED FINANCIAL REPORT FOR THE
YEAR ENDED 31 DECEMBER 2015
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
The directors present their report together with the financial report of Po Valley Energy Limited (‘the Company” or
“PVE”) and of the Group, being the Company and its controlled entities, for the year ended 31 December 2015.
1. Directors
The directors of the Company at any time during or since the end of the financial year are:
Directors
Date of Appointment
M Masterman
B Pirola
G Bradley
G Short
K Eley
22 June 1999 (Managing Director) 11 October 2010 (Non-Executive Director)
10 May 2002
30 September 2004
5 July 2010 -- Resigned 25 January 2016
19 June 2012
Information on Directors
The Board is composed of Non-Executive Directors, including the Chairman. The Chairman of the Board is elected
by the Board and is an independent director.
Graham Bradley — Chairman BA, LLB (Hons), LLM, FAICD, Age 67
Graham joined PVE as a director and Chairman in September 2004 and is based in Sydney. He is an experienced
Chief Executive Officer and listed public company director. Graham previously served as Chief Executive Officer
of one of Australia’s major listed funds management and financial services groups, Perpetual Limited. He was
formerly Managing Partner of a national law firm, Blake Dawson Waldron and was a senior Partner of McKinsey &
Company. Graham is currently Chairman of Stockland Corporation Limited, HSBC Bank Australia Limited, Energy
Australia Holdings Limited and Infrastructure NSW and a director of GI Dynamics Inc. Graham is Chairman of the
Remuneration and Nomination Committee and was a member of the Audit and Risk Committee until December
2010.
Michael Masterman — Non Executive Director, BEcHons, Age 53
Michael is a co-founder of PVE. Michael took up the position of Executive Chairman and CEO of PVE and Northsun
Italia S.p.A. in 2002 and resigned in October 2010 to take up an executive position at Fortescue Metal Group where
he is currently CEO of FMG Iron Bridge iron ore company and recently completed the US$1.15bn sale of a 31%
interest in the project to Formosa Plastics Group. Prior to joining PVE, Michael was CFO and Executive Director of
Anaconda Nickel (now Minara Resources), and he spent 8 years at McKinsey & Company serving major international
resource companies principally in the area of strategy and development. He is also Chairman of W Resources Plc, an
AIM listed company with tungsten and gold assets in Spain and Portugal. Michael became a member of the
Remuneration & Nomination Committee from 1 January 2011.
Byron Pirola — Non Executive Director, BSc, PhD, Age 55
Byron is a co-founder of PVE and is based in Sydney. He is currently a Director of Port Jackson Partners Limited, a
Sydney based strategic management consulting firm. Prior to joining Port Jackson Partners in 1992, Byron spent six
years with McKinsey & Company working out of the Sydney, New York and London Offices and across the Asian
Region. He has extensive experience in advising CEOs and boards of both large public and small developing
companies across a wide range of industries and geographies. Byron is a member of the Audit and Risk Committee
and member of the Remuneration and Nomination Committee.
2|
PO VALLEY ENERGY LIMITED
Kevin Eley — Non Executive Director, CA, F FIN, FAICD Age 66
Kevin Eley was appointed Non-Executive Director in June 2012. Kevin is based in Sydney and was the Chief
Executive of HGL Limited for 25 years until his retirement in 2011. He has management and investment experience
in a broad range of industries including, manufacturing, mining, retail and financial services with experience in the
direction of early stage companies and public company governance. Kevin joined the PVE Audit & Risk Committee
as Chairman and is currently a Non-Executive director of HGL Ltd, Milton Corporation Limited, Hunter Hall
international Limited and Equity Trustees Limited.
Gregory Short — Non Executive Director, BSc, Age 65
Resigned 25 January 2016
Greg Short was appointed Non-Executive Director in July 2010. Greg is a geologist who worked with Exxon in
exploration, development and production geosciences and management for 33 years in Australia, Malaysia, USA,
Europe and Angola. During his time in Europe, Greg was actively involved in Exxon's activities in the Netherlands
and Germany. Greg was Geoscience Director of Exxon's successful development of its Angola offshore operations.
Greg retired from Exxon in 2006 and is a Non-Executive director of ASX listed MEO Australia, Metgasco Limited
and Pryme Oil and Gas Limited. Greg became a member of the Audit and Risk Committee from 1 January 2011.
Gregory Short resigned 25th January 2016.
2. Company Secretary
Lisa Jones – Company Secretary, LLB
Lisa was appointed to the position of Company Secretary in October 2009. She is a corporate lawyer with over 17
years experience in commercial law and corporate affairs, working with large public companies and emerging
companies in Australia and in Europe. She was a senior associate in the corporate & commercial practice of Allen
Allen & Hemsley and spent several years working in Italy, including as international legal counsel at Pirelli Cavi and
as an associate in the Rome office of a national Italian firm.
3. Directors Meetings
The number of formal meetings of the Board of Directors held during the financial year and the number of meetings
attended by each director is provided below:
G Bradley
M Masterman
B Pirola
G Short
K Eley
No. of board meetings held
13
13
13
13
13
No. of board meetings
attended
12
12
11
13
13
No. of Audit & Risk
Committee meetings held
2
2
2
2
2
No. of Audit & Risk
Committee meetings attended
2
1
1
2
2
No. of Remuneration &
Nomination Committee
meetings held
1
1
1
1
1
No. of Remuneration &
Nomination Committee
meetings attended
1
1
1
0
0
* attended meeting as an observer
3
PO VALLEY ENERGY LIMITED
4. Principal Activities
The principal continuing activities of the Group in the course of the year were:
•
The exploration for gas and oil in the Po Valley region in Italy.
•
Appraisal and development of gas and oil fields.
•
Production and sale of gas from the Group’s production wells.
5. Earnings per share
The basic and diluted loss per share for the Company was 5.02 € cents (2014: loss 1.03 € cents).
6. Operating and financial review
The Italian gas market is dominated by gas imports. According to the 2015 Annual Report prepared by the Italian
Ministry of Economic Development, the domestic exploration and production industry represents approximately 8%
of total gas consumption in Italy the majority of which is produced by industry majors including Eni Spa and Edison
Spa in the northern Adriatic Sea. Consequently, the Company has few comparable peers to contrast its operations.
Strategy
PVE’s strategy is to create value for shareholders and stakeholders using its existing and growing Italian oil and gas
resource base. PVE’s strategy focuses on optimising near term production to maximise profitability and expanding
the Company’s resources through exploration and development activities.
The Company’s core portfolio includes 10 onshore assets and the first offshore asset – a game changer in the
Company’s resource potential. The Company’s operations are located in Italy and are run by a local management
team which PVE believe represents a significant competitive advantage not enjoyed by newer entrants seeking to
find success in the Italian market.
The 2015 faced a strong decline in gas prices in Italy, with the market seeing a reduction in order of 25% over the
last 12 months. The decline was even more evident in the last part of the year, with spot prices ranging between Euro
16.5 and 20 cents per cubic metre.
The Company has not been immune to the increasing pressure on the oil and gas industry experienced worldwide.
Funding from both debt and equity sources has been extremely challenging for junior companies like Po Valley
Energy. As previously reported, the Company’s priorities have been to increase production and revenue from its
Sillaro gas field, to seek funding to bring its near term development assets into production and to progress the
Company’s highly prospective licence areas. Directors are currently reviewing several options to supplement the
Company’s cash at bank and revenue in order to fund the Company’s operations in short and medium term. A pro
rata renounceable rights issue to raise approximately Euro 1.2 million (AUD 1.75m) was launched on 18 March of
this year. As outlined in the ASX Market Update of 18 March 2016, the Directors have developed a pathway to
restructure and recapitalise the Company in order to preserve maximum value for shareholders. We refer to the Offer
Document for more details.
Operations
During the year, the Company produced from both its Castello and Sillaro fields with total combined production of
9.84 million cubic metres of gas (0.34 billion cubic feet).
Combined average production for 2015 was 27,000 scm/day. Production started out in the year at a lower rate while
the company was in the process of conducting a reservoir review on Sillaro and increased in the second and third
quarter to 28,000 and 37,000 respectively following the conclusion and the application of that study. In 4Q
production began to curtail in preparation of the rigless campaign. At the day of this report this re-work is ongoing.
4
PO VALLEY ENERGY LIMITED
As previously announced, generally speaking the production reduction at Sillaro over the past 18 months was caused
by depletion of several reservoirs and water arrival and associated sand production from some completions.
Throughout 2015 the Company’s technical team together with specialist advisors reviewed the residual potential in
the Pliocene sequences on both completed and non-completed levels and the opportunity to drill a sidetrack well to
access a lower Miocene reservoir directly below the field. In October, the Company’s technical team finalised a
relatively low cost rig less rework on both wells in order to access remaining gas from the Pliocene. Given the current
funding constraints the sidetrack on Sillaro-1 to access the Miocene has been postponed. The rigless campaign was
initiated in December 2015 and will be completed this month. Once the results are clear a revised reserve estimate
and production forecast for the field will be released to the market.
Thanks to careful production management Castello field increased its daily production during the year from 2,500
scm/day up to a rate of 5,000 scm/day, until November 2015. After a slight decrease in 3Q 2015, the production
stopped in late November, due to gas specifications issues following an increase in the humidity content (dew point)
at the entry point to the national grid. Some investments on the gas treatment plant would be required to allow the
plant to effectively treat the gas and deliver according to SNAM specifications. It is unlikely that this investment
would be carried out until development of Bezzecca commences.
Exploration and Development
During the year the Company made significant progress on the offshore project Teodorico and in August the
Company filed a production concession application with the Ministry of Economic Development. The filing of this
application represents a milestone event for the Company following a material investment in geoscience including
the purchase and reprocessing of 3D seismic data and the detailed preliminary front-end engineering and design
(PRE-feed) study completed earlier in the year.
Five months following the filing of the concession application, the Italian Parliament passed the 2016 Budget Law
which includes further restrictions on offshore oil and gas activity including the re-introduction of a general ban on
Exploration and Production activity within 12 nautical miles of the coast of Italy. Approximately half of the
exploration license AR94PY and a small unutilised section of the production concession area lie within the 12
nautical mile. As a result, in February 2016 the Company was informed by the Ministry that the perimeter of the
production concession area needed to be reshaped in order to be eligible for production concession status. The new
perimeter was communicated a few weeks later showing that the application should be largely unaffected as all
envisaged development activity is within the permitted area. The Company is now waiting to receive a formal
response from the Ministry to its production concession application. If positive, this would result in a preliminary
production concession subject to environmental review by the Ministry of Environment.
As regards the broader exploration licence (AR94PY) the Company has been informed by the Italian Ministry of
Economic Development that this acreage will not be reduced or reshaped in any way; however the area will be limited
to exploration activity only and a production concession for any discovered resources will not be awarded under the
current legislation. The Company does not currently have any pending applications regarding exploration activity in
the license AR94PY.
In October, the Company announced the sale of its 75% interest in the fully awarded exploration license La Prospera.
The license also includes a preliminary production concession for the Gradizza gas discovery located within the
licence. AleAnna also acquired the Company’s share of the preliminarily awarded adjacent exploration license Zanza
for Euro 1,850,000. The sale was finalised in December following formal approval by the Italian Ministry of
Economic Development.
In respect of the production concession Cascina Castello which includes Bezzecca, the Company was unable to secure
a second farm-out partner necessary to fund this project in 2015 primarily due to the challenging state of the oil and
gas industry which has forced many companies to stall investment in new projects. The Company continues to seek
a partner or sell the project to increase the Company’s cash reserves. The project remains attractive and fully
authorised, ready for development.
5
PO VALLEY ENERGY LIMITED
In relation to Sant’Alberto and Selva, some progress was made during the year to complete the environmental
assessment for the development of the gas treatment plant and the drilling authorisation respectively. At the date of
this Directors’ Report both assessments are believed to be effectively complete and the Company expects the final
EIA Decree any day. Selva continues to be a major prospective development and exploration license for the Company
and a strategic priority.
Financial performance
Total revenue from the full year of gas production was €2,496,267, a year on year decline of €2,537,566 or 50.4%.
This decrease in revenue is attributable to lower production volumes from the Sillaro field. Earnings before interest,
tax, impairment, depreciation and amortisation (EBITDA) for the year was a loss of €795,406 and decreased
€2,334,918, compared to the previous year. This decrease is mainly driven by the decrease in revenue of €2,537,566
which was partially offset by savings in employee expenses and corporate overheads of €276,666. As previously
communicated to shareholders, the Company continues to be committed to reviewing its cost structure and
organisation on an ongoing basis with the aim to reduce fixed costs. In summer 2015, the Company extended its offtake agreement with a global oil and gas major until September 2017.
Net loss before impairment expense is reconciled to comprehensive loss for the period as follows:
Comprehensive profit reconciliation table ( in Euro )
2015
2014
Net loss before impairment expense (unaudited)
(3,014,927)
(1,242,182)
Impairment on resource property costs for the Sillaro field
(2,558,276)
-
Impairment on resource property costs for the Castello field
(233,566)
-
Loss on sale of project
(822,203)
-
Exploration costs expensed
(28,854)
(20,180)
(6,657,826)
(1,262,362)
Comprehensive loss for the year
Earnings before interest, tax, impairment, depreciation and amortisation (EBITDA) amounted to a loss of €795,406
for the year.
EBITDA (unaudited) is reconciled to statutory results from operating activities as follows:
EBITDA reconciliation table ( in Euro )
2015
2014
EBITDA
(795,406)
1,539,512
(1,640,555)
(2,264,401)
Depreciation expense
(14,020)
(13,791)
Impairment losses
(2,820,696)
(20,180)
Loss on disposal of project
(822,203)
-
Other miscellaneous income
112,137
251,380
(5,980,743)
(507,480)
Depreciation and amortisation expense
Results from operating activities
Financial position
The Company completed a restructure of its borrowing arrangements under a reserve based lending facility with its
primary lender Nedbank Limited. The details of this restructure were announced to ASX on 21 January 2016 and
included repayments totalling €2.2 million in January 2016 reducing the outstanding amount to €576,000. A
repayment plan has been agreed which would see the facility extinguished by 30 September 2016.
6
PO VALLEY ENERGY LIMITED
The Company successfully raised €872,906 (AU$1,242,000) through a private placement at AU$0.07 per share to
new and existing non-director shareholders in May 2015. The funds were used for general working capital purposes
and to further develop the Company’s asset portfolio. Cash and cash equivalents at year end 2015 amounted to
€2,446,005 before the above mentioned repayment to Nedbank.
Health and safety
Paramount to PVE’s ability to pursue its strategic priorities is a safe workplace and a culture of safety first. The
Company regards Environmental awareness and Sustainability as key strengths in planning and carrying out business
activities. PVE’s daily operations are conducted in a way that adheres to these principles and management are
committed to their continuous improvement. Whilst growing from exploration roots, the Company has strived to
continually improve underlying safety performance. The Company has adopted an HSE Management System which
provides for a series of procedures and routine checks (including periodical audits) to ensure compliance with all
legal and regulatory requirements and best practices in this area. In 2015, PVE maintained its outstanding
occupational health safety and environmental track record with no incidents or near misses to report during the 42,681
man-hours worked at the well sites and in the administrative offices.
In addition to health and safety, Management and the Board use a number of operating and financial indicators to
measure performance overtime against our overall strategy. Refer to note 11 of the Directors report for details of
selected performance indicators.
Principle risks and uncertainties
Oil and gas exploration and appraisal involves significant risk. The future profitability of the Company and the value
of its shares are directly related to the results of exploration and appraisal activities. There are inherent risks in these
activities. No assurances can be given that funds spent on exploration and appraisal will result in discoveries that will
be commercially viable. Future exploration and appraisal activities, including drilling and seismic acquisition may
result in changes to current perceptions of individual prospects, leads and permits.
The Company identifies and assesses the potential consequences of strategic, safety, environmental, operational,
legal, reputational and financial risks in accordance with the Company’s risk management policy. PVE management
continually monitors the effectiveness of the Company’s risk management, internal compliance and control systems
which includes insurance coverage over major operational activities, and reports to the Audit and Risk Committee
on areas where there is scope for improvement. The Charter for the Audit and Risk Committee is available on the
Company’s website. The principal risks and uncertainties that could materially affect PVE future performance are
described below.
7
PO VALLEY ENERGY LIMITED
External risks
Exposure to gas
pricing
Changes to law,
regulations or
Government policy
Uncertainty of timing
of regulatory
approvals
Volatile oil and gas prices make it difficult to predict future price movements with any certainty.
Decline in oil or gas prices could have an adverse effect on PVE. The Company does not currently
hedge its exposures to gas price movements long term. The profitability of the Company’s
prospective gas assets will be determined by the future market for domestic gas. Gas prices can
vary significantly depending on other European gas markets, oil and refined oil product prices,
worldwide supply and the terms under which long term take or pay arrangements are agreed.
Changes in law and regulations or government policy may adversely affect PVE’s business.
Examples include changes to land access or the introduction of legislation that restricts or inhibits
exploration and production.
Similarly changes to direct or indirect tax legislation may have an adverse impact on the
Company’s profitability, net assets and cash flow.
Delays in the regulatory process could hinder the Company’s ability to pursue operational
activities in a timely manner including drilling exploration and development wells, to install
infrastructure, and to produce oil or gas. In particular, oil and gas operations in Italy are subject
to both Regional and Federal approvals.
Operating risks
Exploration,
development and
production
Estimation of reserves
Tenure security
Health, safety and
environmental matters
The future value of PVE will depend on its ability to find, develop, and produce oil and gas that
is economically recoverable. The ultimate success or otherwise of such ventures requires
successful exploration, establishment of commercial reserves, establishment and successful
effective production and processing facilities, transport and marketing of the end product.
Through this process, the business is exposed to a wide variety of risks, including failure to locate
hydrocarbons, changes to reserve estimates or production volumes, variable quality of
hydrocarbons, weather impacts, facility malfunctions, lack of access to appropriate skills or
equipment and cost overruns.
The estimation of oil and natural gas reserves involves subjective judgments and determinations
based on geological, technical, contractual and economic information. It is not an exact
calculation. The estimate may change because of new information from production or drilling
activities.
Exploration licences held by PVE are subject to the granting and approval by relevant government
bodies. Government regulatory authorities generally require the holder of the licences to
undertake certain proposed exploration commitments and failure to meet these obligations could
result in forfeiture. Exploration licences are also subject to partial or full relinquishments after
the stipulated period of tenure if no alternative licence application (e.g. production concession
application) is made, resulting in a potential reduction in the Company’s overall tenure position.
In order for production to commence in relation to any successful oil or gas well, it is necessary
for a production concession to be granted.
Exploration, development and production of oil and gas involves risks which may impact the
health and safety of personnel, the community and the environment. Industry operating risks
include fire, explosions, blow outs, pipe failures, abnormally pressured formations and
environmental hazards such as accidental spills or leakage of petroleum liquids, gas leaks,
ruptures, or discharge of toxic gases. Failure to manage these risks could result in injury or loss
of life, damage or destruction of property and damage to the environment. Losses or liabilities
arising from such incidents could significantly impact the Company’s financial results.
8
PO VALLEY ENERGY LIMITED
In addition to the external and operating risks described above, the Company’s ability to successfully develop
future projects including their infrastructure is contingent on the Company’s ability to fund those projects through
operating cash flows and affordable debt and equity raisings.
7. Dividends
No dividends have been paid or declared by the Company during the year ended 31 December 2015.
8. Significant events after the balance date
On 20 January 2016, the Company announced the restructure of its borrowing arrangements with Nedbank Limited,
its primary lender. In accordance with the agreed terms, the Company repaid €2.2 million on 19 January 2016
reducing the outstanding amount to €576,000. Under the revised agreement, the Loan Facility will be changed from
a reserve based loan to a standard loan with an agreed repayment plan in the form of monthly instalments in order to
extinguish the facility by 30 September 2016. The Company’s shares were temporarily halted from 14 January to 20
January 2016 whilst the new terms of the arrangement were under negotiation.
On 24 January 2016, one of the Company’s Non Executive Directors Greg Short retired due to some pressing family
issues which did not allow Mr. Short to devote the necessary time and effort to carry out his Board duties effectively.
On 18 March 2016 the Board updated the market on its strategy to recapitalise and restructure the Company with the
aim to preserve maximum value for shareholders. This strategy includes an unmarketable parcel sale facility that was
announced and initiated on 10 March 2016 and will close on 27 April 2016. Another key step to restructure the
Company was a pro rata renounceable rights issue to raise approximately $1.75 million (Euro 1.1 million) which was
also announced on 18 March 2016.
On 18 March 2016 the Company entered into a short term unsecured bridging loan facility pending completion of
the Sillaro rework which, as at the date of this report, is currently ongoing. The Facility was provided by Beronia
Investments Pty Ltd, an entity associated with Director Dr. Byron Pirola. Under the facility the Company may draw
down up to €300,000.
Other than matters already disclosed in this report, there were no other events between the end of the financial year
and the date of this report that, in the opinion of the Directors, affect significantly the operations of the Group, the
results of those operations, or the state of affairs of the Group.
9. Likely Developments
The Company plans to seek a suitable farm-out partner for selected assets. The Company also plans to continue to
invest in its current exploration portfolio through geological and geophysical studies and, subject to available
finances, in its planned drilling program for high potential gas prospects.
10. Environmental Regulation
The Company’s operations are subject to environmental regulations under both national and local municipality
legislation in relation to its mining exploration and development activities in Italy. Company management monitor
compliance with the relevant environmental legislation. The Directors are not aware of any breaches of legislation
during the period covered by this report.
11. Remuneration Report - audited
The Remuneration Report outlines the remuneration arrangements which were in place during the year, and remain
in place as at the date of this report, for the Directors and executives of the Company.
9
PO VALLEY ENERGY LIMITED
Remuneration Policy
The Remuneration & Nomination Committee (Committee) is responsible for reviewing and recommending
compensation arrangements for the Directors, the Chief Executive Officer and the senior executive team. The
Committee assesses the appropriateness of the size and structure of remuneration of those officers on a periodic basis,
with reference to relevant employment market conditions, with the overall objective of ensuring maximum
stakeholder benefit from the retention of a high quality board and executive team.
The Company aims to ensure that the level and composition of remuneration of its directors and executives is
sufficient and reasonable in the context of the internationally competitive industry in which the Company operates.
All senior executives except the company secretary are based in Rome and when setting their remuneration the Board
must have regard to remuneration levels and benefit arrangements that prevail in the European oil and gas industry
which remains highly competitive.
10
PO VALLEY ENERGY LIMITED
Consequences of performance on shareholder wealth
In considering the Group’s performance and benefits for shareholders wealth the Board has regard to the following
indices in respect of the current financial year and the previous financial periods.
Indices
2015
2014
2013
2012
2011
2010
Production (scm’000)
9,991
18,560
23,983
24,673
28,995
26,793
Average realised gas price (€ cents per cubic metre)
25
27
28
33
31
27
EBITDA (unaudited) (€'000s)
(795)
1,540
1,755
4,473
4,411
2,219
Profit / (loss) attributable to owners of the Company (€'000s)
(6,658)
(1,262)
(5,796)
2,373
(5,071)
(2,324)
Earnings / (loss) per share (€ cents per share)
(5.02)
(1.03)
(4.76)
2.12
(4.57)
(2.11)
Share Price at year end - AU$
0.026
0.10
0.12
0.12
0.16
0.21
In establishing performance measures and benchmarks to ensure incentive plans are appropriately structured to align
corporate behaviour with the long term creation of shareholder wealth, the Board has regard for the stage of
development of the Company’s business and gives consideration to each of the indices outlined above and other
operational and business development achievements of future benefit to the Company which are not reflected in the
aforementioned financial measures.
Senior Executives and Executive Directors
The remuneration of PVE senior executives is based on a combination of fixed salary, a