PVE May 2015 presentation
Released
Released
Announcement PDF
PO VALLEY OVERVIEW
• 5 fields: two currently in production and three under development (cumulative
onshore 2P reserves + 2C resources of 40.3 bcf)*
• Significant gas flow and earnings growth in 2015-2016. Work program ready for
Sillaro and Bezzecca development. Production capability ramped-up to circa
135,000 scm/day (€14 million in revenue /p.a.)
• Large offshore Adriatic gas licence (AR94PY) with 4 gasfield discoveries
– first production field (Teodorico) currently going through regulatory process to be
“development ready”
• Large scale onshore oil exploration prospect
• Proven Italy based oil and gas discoveries
* Please refer to the Company’s 2014 Annual Report lodged with ASX on 14 April 2015 for full details of the Company’s reserves and resources
2
as at 31 December 2014
PO VALLEY PORTFOLIO
Company:
Overall portfolio area:
2P reserves:
2C resources:
Po Valley Energy Ltd (ASX:PVE)
2,000 km2 in 15 licences
13 bcf
91 bcf
PVE strategic action plan:
1. Significant production boost in 2015 (Bezzecca production and Sillaro
recompletion, regulatory approvals largely in place);
2. Develop offshore field Teodorico;
3. Appraise and Develop high IRR Selva remaining volume
4.
Drill Torre del Moro oil prospect
3
ITALY: LARGE DEMAND AND
HIGHLY IMPORT DEPENDANT
• 2013 gas consumption was 2.42
tcf* with domestic production
covering only 11% at 0.28 tcf*
• Northern Italy is one of the
Europe's largest onshore gas
provinces*
• Central government is supporting
domestic production (through the
«Sblocca Italia» decree)
• Extensive pipeline grid
* CIA 2013 Factbook
Gas Price By Comparison – Italy GR04, UK NBP & US HH
4
ITALY: LARGE MARKET AND HIGH
GAS PRICES
Brent vs Italian Gas price (6 months)
1.00
1.08
1.09
0.80
0.60
0.40
0.38
0.20
0.00
Italy
UK
US
Brent: € per barrel
US $cents / cf
1.20
€ 90
€ 80
€ 70
€ 60
€ 50
Gas Price 2013 – Italy vs UK and USA
€ 40
€ 30
€ 20
€ 10
€Aug-14 Sep-14 Oct-14 Nov-14
Crude Brent price (€ per barrel)
Gas Price By Comparison – Italy GR04, UK NBP & US HH (2013 data)
0.35
0.3
0.25
0.2
0.15
0.1
PB Gas: €/scm
Gas market price comparison
0.05
0
Dec-14
Jan-15
Italian PB Gas price (€/Scm)
5
ITALY
HYDROCARBON PROVINCES
Gas
Bezzecca
PO PLAIN
Oil
Sillaro/Selva
Teodorico
PO PLAIN
Torre del Moro
NORTHERN ADRIATIC
CENTRAL ADRIATIC
CENTRAL ADRIATIC
SOUTH ADRIATIC
SOUTH ADRIATIC
VAL D’AGRI
CALABRIAN ARC
NUMIDIAN
IBLEAN PLATEAU
Biogenic Gas
Thermogenic gas
NILDE
IBLEAN PLATEAU
Oil
6
PVE PROJECTS
7
PRODUCTION AND NEAR TERM
DEVELOPMENT
SILLARO
BEZZECCA
SANT’ALBERTO
GRADIZZA
Status: Producing
NPV: €9.0m
Reserves: 2P: 4.1 bcf
First gas: 3Q2015
NPV [gross]: € 4.3m
Reserves: 2P: 3.7 bcf
First gas:2Q 2016
NPV:€ 4.3m
Resources:2C: 2.1 bcf
First gas: 1Q 2017
NPV[gross]: € 3.3m
Resources: 2C: 2.7 bcf
8
SILLARO – 2015 WORK PROGRAM
Sillaro production concession (PVE 100%):
Sillaro 1 Side track
•
Proven production capability (approximately 4 bcf
produced to date from 2 wells)
•
Historically, PVE invested €15 million and generated
over €30 million in revenue in 5 years.
Miocene medium level depth map (c.i. 2.5m)
Unlocking Future Field Potential
•
Certified residual reserves – 4.1 bcf (2P)
•
Envisaged work-over:
- re-complete Sillaro-2
- drill sidetrack from Sillaro-1 (to intersect Miocene)
2 targets
- Pliocene (known levels, never produced)
- Miocene (known reservoir)
•
9
BEZZECCA –
DEVELOPMENT PLAN
Castello/Bezzecca production concession (PVE 90%):
• Bezzecca-1 successfully drilled and tested
in 2009. Showed excellent gas indications
on logs and tested up to 62,900 scm/day
• Certified 2P reserves: 4.2 bcf
• Authorised to drill second development well
(Bez-2)
• Total net development cost (pipe +
development well Bez-2): €5.9 million
• Field well defined by nineteen 2D seismic
lines totalling 85 km, with 1.3 km to 1.5 km
line spacing
• Reservoirs are three levels from upper
Miocene to lower Pliocene. Gas bearing
structure bound by NE-SW oriented faults
10
Large high value projects to follow
• Teodorico: offshore gas (47.3 bcf – 2C)
• Selva: onshore gas (17 bcf – 2C)
• Torre del Moro: onshore oil
11
PO VALLEY
3 YEARS WORK PROGRAM
2015 work plan
1 Recomplete sillaro 2
2 Install Bezzecca pipeline
3 Drill Bezzecca 2 well
Subtotal 2015
2016 work plan
4 Drill Selva**
5 Drill Sillaro 3 sidetrack
6 Production for S.Alberto - Gradizza
Subtotal 2016
** Selva production will start 18-24 months after succesful drilling
2017 work plan
7 Develop Teodorico (~50 Bcf)
8 Drill Torre del Moro (150-250 mm bbls)
Subtotal 2017
* Net of JV partners contributions
Net Capex*
(€ million)
Δ Production
(Scm/day)
Δ Revenue
(€m/year)
1.8
2.2
3.9
7.9
50,000
15,000
30,000
95,000
4.9
1.5
2.9
9.2
2.5
4.1
2.4
9.0
100,000
40,000
40,000
180,000
9.7
3.9
3.9
17.5
50.0
30.0
80.0
300,000
n/a
300,000
29.2
n/a
29.2
12
OFFSHORE LICENCE NEAR ALL
MAJOR ENI DISCOVERIES
13
TEODORICO: DRILLED WITH FULL
3D SEISMIC
• Contingent Resources certified at:
1C : 34.6 bcf
Offshore gas plant pic
2C : 47.3 bcf
3C : 62.2 bcf
• 120 km2 of 3D seismic purchased
• 2 wells completed and tested
POTENTIAL NEAR-TERM
PRODUCTION CONCESSION,
WITHOUT FURTHER EXPLORATION
DRILLING REQUIREMENT
14
OFFSHORE LICENCE WITH 3D
SEISMIC AND ENI WELL DATA
PVE holds the attractive AR94PY licence (Exploration licence
awarded in July 2012) which is host to:
• 1 gas field “Carola / Irma (Teodorico)” – 47 bcf (2C)
• 2 ENI discoveries
- Adele
- Azzurra / Ginevra
• 1 Exploration potential upside (Rita) with the same play of
nearby producing ENI gas field “Naomi Pandora”
AR49PY licence has:
• Full 3D seismic coverage (under reprocessing) and previous
wells information purchased from ENI
• Process and distribution at utility rate through ENI’s adjacent
Naomi Pandora processing facility
• Shallow water depth ~ 30 meters
• Deep oil carbonates exploration potential
15
NEXT DEVELOPMENT :
HIGH IRR ONSHORE SELVA FIELD
East Selva
(exploration target)
Selva Stratigraphic
Development target
• 2C Resources: 17 Bcf
• Development NPV: €28.6m
• Development IRR*: 65%
* As audited by Robertson CGC May 2013.
16
NEXT DEVELOPMENT :
HIGH IRR ONSHORE SELVA FIELD
• G&G work carried out in 2012 to assess the residual potential of the Selva gas field
(84 bcf already produced)
• License holds two targets: a low risk volume up dip of abandoned producers
(named “Selva Stratigraphic”) and a second exploration target on the pinch out edge
to the east of the main Selva field
• Drilling application expected to be issued 3Q 2015
• Planned acquisition of 3D seismic data for additional potential at East Selva
17
LARGE SCALE OIL
EXPLORATION LICENCE
• The “Torre del Moro” oil
exploration licence (100% PVE)
is a Mesozoic carbonate
structure with analogy to ENI
Villa Fortuna field (230 MM
BBLS)
• 1 well drilled (Sarsina-1) with oil
shows at a 15km distance in the
same formation
• Relatively shallow depth
structure (top at 3,500 / 4,000
mt)
• Seismic analysis indicates large
structure with clear top and seal
• PVE obtained EIA and is
currently expecting the final grant
18
TORRE DEL MORO G&G
19
ENI’S TRECATE - VILLA FORTUNA
(ANALOGOUS TO PVE TORRE DEL MORO)
Location: 30km west of Milan
Discovery: 1984
Production to Date: 220 million bbls + 95 bcf of
gas
Production: Initial Rate 82,000bbls/day
Current Production: 5,000bbls/day
Oil Gravity: 42 - 45º API
Transport Costs: US$ ~ 1/bbl
20
SUMMARY
•
Exceptional portfolio: Production + Development + high exploration upside
•
€20m financing facility in place to finance a portion of future Capex
•
Major re-evaluation triggers over the next 24 months based on key
asset events
- 2015 production ramp-up work program
- Teodorico - Grant of production concession and ability to secure debt
financing
- Selva - Drilling approval ensuring a high IRR, low capex and low risk
development
- Torre del Moro - Drilling approval for the large scale oil prospect
•
High return investment opportunity prior to re-evaluation
21
INFORMATION REQUIRED
BY ASX CHAPTER 5 LISTING RULES
•
All the reserves and resources referred to in this presentation are as reported in the Company’s 2014 Annual Report lodged with
ASX on 14 April 2015. Please refer to the Annual Report for full details of the Company’s reserves and resources as at 31
December 2014 and details of the independent evaluation of those estimates.
•
All estimates have been determined using a probabilistic method except for Sillaro, Vitalba, Bezzecca, Sant’Alberto and
Fantuzza, which were determined using a deterministic method;
•
The reference point for gas flow from Vitalba & Sillaro is measured through a turbine, located on the wells site, using non
standard cubic metres. The figure is standardised using a Fiorentini Fiomec Calculator (FFC) which is a conversion consisting of
gas temperature and pressure with gas quality parameters. The outcome of this conversion is the actual gas volume in standard
cubic meters injected in the SNAM gridline. (SNAM is an Italian natural gas infrastructure company and manages the national
gas transportation network). The SNAM entry points for Sillaro & Vitalba are located 200 metres and 50 metres respectively from
site perimeters. The FFC prints a production report which is authenticated by the Ministry of Economic Development and this
official data is then accepted by SNAM, our customers and the Taxation Authority.
•
The Company confirms that it is not aware of any new information or data that materially affects the information included in the
Company’s 2014 Annual Report and that all material assumptions and technical parameters underpinning the estimates in that
Annual Report continue to apply and have not materially changed.
22
REGISTERED OFFICE
Suite 8, 7 The Esplanade
Mt Pleasant, WA 6153 Australia
TEL +61 (08) 9316 9100
FAX +61 (08) 9315 5475
ROME OFFICE
Via Ludovisi 16
Rome Italy 00187
TEL +39 06 4201 4968
FAX +39 06 4890 5824
This presentation is for informational purpose only and should not be considered as an invitation or recommendation to purchase securities in Po Valley Energy Limited.
This presentation may contain forward looking statements that are subject to risk factors associated with the oil and gas industry. Po Valley Energy Limited has not audited or investigated the accuracy or
completeness of the information, statements and opinions contained in this presentation. Accordingly, to the maximum extent permitted by applicable laws, Po Valley Energy Limited makes no
representation and can give no assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or
completeness of, or any errors in or omission, from any information, statement or opinion contained in this presentation.
The statements contained in this presentation may be affected by variables and changes in underlying assumptions which could cause actual results or trends to differ, including but not limited to price
fluctuations, actual demand, currency fluctuations drilling and production results, reserve estimations, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and
regulatory changes, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates.
You should not act or refrain from acting in reliance on this presentation material. This overview of Po Valley Energy Limited does not purport to be all inclusive or to contain all information which its
recipients may require in order to make an informed assessment of Po Valley Energy Limited’s prospects. You should conduct your own investigation and perform your own analysis in order to satisfy
yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation and making any investment decision.
The contents of this presentation are confidential. This presentation is being provided to you on the condition that you do not reproduce or communicate it or disclose it to, or discuss it with, any other
person without the prior written permission of Po Valley Energy Limited. The views express within this document are solely those of Po Valley Energy Limited.
www.povalley.com
info@povalley.com
23
Share your feedback
Discover