Annual Report to shareholders
Released
Released
Announcement PDF
Annual Report
Year ended 31 December 2025
PO VALLEY ENERGY LIMITED
ABN 33 087 741 571
CONTENTS
CORPORATE DIRECTORY ........................................................................................................................................... 1
CHAIRMAN’S LETTER TO SHAREHOLDERS................................................................................................................. 2
DIRECTORS’ REPORT ................................................................................................................................................. 3
REMUNERATION REPORT ....................................................................................................................................... 12
AUDITOR’S INDEPENDENCE DECLARATION ............................................................................................................ 19
STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME ............................................................ 20
STATEMENT OF FINANCIAL POSITION .................................................................................................................... 21
STATEMENT OF CHANGES IN EQUITY ..................................................................................................................... 22
STATEMENT OF CASH FLOWS ................................................................................................................................. 23
NOTES TO THE FINANCIAL STATEMENTS................................................................................................................. 24
CONSOLIDATED ENTITY DISCLOSURE STATEMENT ................................................................................................. 56
DIRECTORS’ DECLARATION ..................................................................................................................................... 57
INDEPENDENT AUDITOR’S REPORT ........................................................................................................................ 58
TECHNICAL SUMMARY – RESERVES AND RESOURCES STATEMENT ....................................................................... 63
ASX ADDITIONAL INFORMATION ............................................................................................................................ 72
PO VALLEY ENERGY LIMITED
ABN 33 087 741 571
CORPORATE DIRECTORY
1
Directors Kevin Bailey AM Chairman
Sara Edmonson Non-Executive Director
Joseph Constable Non-Executive Director
Katrina O’Leary Non-Executive Director
Michael Gentile Non-Executive Director
Company Secretary Lucia McLean
Registered Office Level 5, 191 St Georges Terrace, Perth WA 6000
Rome Office Via Isonzo 34, Rome 00198 Italy
Tel: +39 06 42014968
Share Register Automic
Level 5, 191 St Georges Terrace, Perth WA 6000
Tel: 1300 288 664
Auditor HLB Mann Judd
Level 4, 130 Stirling Street, Perth WA 6000
Solicitors Steinepreis Paganin
Level 14, QV1 Building, 250 St Georges Terrace Perth WA 6000
Stock Exchange Listing Australian Securities Exchange (ASX) under the code PVE
OTC Markets Group (OTCQB) under the code PVLEF
Website address www.povalley.com
PO VALLEY ENERGY LIMITED
ABN 33 087 741 571
CHAIRMAN’S LETTER
2
Dear Shareholder,
On behalf of the Board of Directors, I am pleased to present Po Valley Energy’s Annual Report for the
year ended 31 December 2025, a year in which the Company strengthened its position as a profitable
and growing domestic gas producer in Italy.
The Company delivered a solid financial performance, with revenue of €7.05 million and net profit
after tax of €2.72 million. This result was underpinned by consistent production from the Podere
Maiar-1 well and reflects the disciplined execution of our strategy and focus on cost control. The
strength of this performance has enabled the Board to introduce a maiden dividend policy,
demonstrating our commitment to delivering returns to shareholders.
During the year, we also made important progress across our development portfolio. The successful
acquisition of 3D seismic data, now in processing and interpreting phase, will improve our
understanding of all the fields within the Selva Malvezzi Production Concession and enhance our
ability to optimise field development and unlock additional reserves. In parallel, we continued to
advance our onshore projects, Selva Malvezzi-1, Casale Guida, Ronchi and Bagnarola through the next
phases of environmental and development approvals and permitting, which provide a pathway to
incremental production growth.
We are continuing to evaluate strategic options to unlock value from our offshore Teodorico asset in a
manner aligned with market conditions and regulatory developments.
The broader operating environment in Italy remains supportive, with increasing emphasis on domestic
gas supply and energy security. As a local producer with established infrastructure and a portfolio of
development opportunities, Po Valley is well positioned to benefit from these trends.
Looking ahead, the Company is focused on building on its existing production base while progressing
its development assets in a disciplined manner. We believe this approach provides a clear pathway to
sustainable growth and the creation of long-term shareholder value.
I would like to acknowledge the dedication of our Board, management team and staff, whose efforts
continue to drive the Company forward. I also thank our shareholders for your continued support as
we build on this momentum.
Yours faithfully,
Kevin Bailey AM
Chairman
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
3
The Directors of Po Valley Energy Limited (“the Company” or “PVE”) present their report together with the
financial report for the year ended 31 December 2025 of the Group, being the Company and its controlled
entities (“the Group” or “Po Valley”).
1. Directors
The Directors of the Company at any time during or since the end of the financial year are:
Kevin Bailey AM — Director since 22 April 2016
Non-Executive Chairman
DipFP, Age 65
Kevin was appointed as a director on 22 April 2016 and as Chairman on 2 May 2022. He has been a shareholder
of PVE since April 2008 and brings significant business acumen and experience to the Board. Kevin is a highly
successful businessman with a range of business interests, both local and overseas. He worked for 28 years as
a Certified Financial Planner and was a founding director of Shadforth Financial Group Limited. He was a
member of the Prime Minister’s Community Business Partnership and devotes considerable time to
philanthropic interests. Kevin is currently Chairman of Parousia Media Pty Ltd and has served as director of
various entities including the Investment Advisory Board of the Timor Leste Petroleum Fund, the $17bn
Sovereign Wealth Fund of Timor Leste, Outward Looking International Pty Ltd, Halftime Australia Pty Ltd, Alpha
Australia, Empart Inc, and Dads4Kids Fatherhood Foundation. In the past three years, Kevin has not been a
director of any other listed company.
Sara Edmonson — Director since 23 December 2019
Non-Executive Director
BSBA, MBA, Age 46
Sara was appointed as a director on 23 December 2019. Sara has extensive experience in natural gas, the
critical transition fuel for a low carbon future. Sara is a former President at Associazione Energia Nazionale, an
Italian association created to promote sustainable production, transportation and use of domestic energy and
is fluent in Italian, having previously worked both in Italy and internationally for Ernst & Young Transaction
Advisory Services. During her tenure at EY, Sara advised numerous blue-chip corporate clients on transactions
in Russia, Romania, Turkey and the US including the US$5 billion acquisition of DRS Technologies by
Finmeccanica in 2008. She holds an MBA from St John’s University in New York City and a Masters in
Sustainability Sciences from Harvard University. Sara led PVE as CEO from July 2010 to 2017 and served on the
board of Coro Energy Plc from November 2017 to October 2018 and as executive until March 2019. Sara has
spent the last several years focused on the energy transition leading large commercial-scale development of
green hydrogen projects in Europe. She has been deeply involved in the policy shaping around decarbonisation
and climate targets at EU and Member State level. In the past three years, Sara has not been a director of any
other listed company.
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
4
Joseph Constable — Director since 30 November 2021
Non-Executive Director
BA(Hons) MPhil, Age 34
Joseph was appointed as a director on 30 November 2021. Joseph has been a long term shareholder of PVE
and has a detailed understanding of the company’s assets and brings his significant financial skills to PVE and
the Board. Joseph was previously an executive director of Hancock & Gore (ASX: HNG), and portfolio manager
at H&G Investment Management Limited and Executive Director at H&G High Conviction Limited (ASX: HCF).
Jospeh is a non-executive director of The Hydration Pharmaceuticals Company Limited (ASX:HPC).
Other than as listed above, in the past three years, Joseph has not been a director of any other listed company.
Katrina O’Leary — Director since 2 May 2022
Non-Executive Director
BA LLB, LLM, Age 62
Katrina was appointed as a director on 2 May 2022. Katrina is an Intellectual Property (IP) and Information
Technology lawyer with decades of experience in IP management, commercial and litigious matters. Katrina
also advises on ESG compliance especially in the area of ethical sourcing. Her practice is international, and she
has worked in Italy, the USA and Australia representing government and international organisations and major
public companies. Katrina brings to the board her strength in legal compliance, governance, and risk
management. In the past three years, Katrina has not been a director of any other listed company.
Michael Gentile — Director since 25 November 2024
Non-Executive Director
CFA Charter Holder, Age 46
Michael was appointed as director on 25 November 2024. Michael is considered one of the leading strategic
investors in the junior resource sector in Canada, owning significant top-five ownership stakes in over 20 small-
cap mining companies, and is also a shareholder of PVE. He is currently a director of Group Eleven Resources
(TSX-V: ZNG), Northern Superior Resources (TSXV:SUP), OnGold (TSX-V:ONAU) Radisson Mining Resources
(TSX-V: RDS), Roscan Gold (TSX-V: ROS) and Solstice Gold (TSX-V: SGC) and a Strategic Advisor to Northisle
Copper and Gold (TSX-V: NCX). Michael cofounded Bastion Asset Management in January 2022 a rapidly
growing money management firm in Montreal focused on small to mid-cap equities in the USA and Canada.
Michael was previously a Vice President and Senior Portfolio Manager with Formula Growth Limited where he
worked from 2002 to 2018. In the past three years, Michael has not been a director of any other ASX listed
company.
2. Company Secretary
Kevin Hart – Company Secretary, B.Comm, FCA – Resigned 26 March 2026
Kevin Hart is a Chartered Accountant and was appointed to the position of Company Secretary on 17 April
2018. He has over 30 years’ experience in accounting , management and administration of public listed entities
in the mining, mining services and exploration industry. Kevin is a Principal in the Company Secretarial and
CFO divisions of the Automic Group which provides Company Secretarial, CFO support and corporate
compliance advice to a number of ASX listed entities. Kevin retired on 26th
March 2026.
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
5
Lucia McLean – Company Secretary, B.Comm, HDipAcc CA –Appointed 26 March 2026
Lucia is a Chartered Accountant with over 30 years’ experience in finance, accounting and company secretarial
services in private, public and listed companies in Australia, UK and South Africa. She holds a Bachelor of
Commerce and Higher Diploma in Accountancy form Rhodes University, South Africa and is a member of the
Chartered Accountants Australia & New Zealand. Lucia is a Senior Manager with Automic Group Professional
Services. Lucia has been appointed as Company Secretary following Kevin Hart’s retirement on 26 March 2026.
3. Directors’ Meetings
The number of meetings of the Board of Directors held during the financial year and the number of meetings
attended by each director are provided below:
Director Attended Held
Kevin Bailey AM 7 7
Sara Edmonson 7 7
Joseph Constable 7 7
Katrina O’Leary 7 7
Michael Gentile 6 7
Held: represents the number of meetings held during the time director held office.
The roles and responsibilities normally undertaken by the Audit and Risk Committee and the Remuneration
and Nominations Committee have been dealt with by the full board as part of its duly convened meetings
rather than through separate committees.
4. Principal Activities
The principal continuing activities of the Group in the course of the year were:
• Production of gas at Podere-Maiar 1 in the Selva Malvezzi concession.
• The exploration for gas and oil in the Po Valley region in Italy.
• Appraisal and development of gas and oil fields.
5. Operating and financial review
Overview
During the reporting period, Po Valley Energy Limited maintained stable production performance from its Selva
Malvezzi gas field while advancing key development initiatives to support future growth. The Company
continues to operate as a low-cost, cash-generative onshore gas producer in Italy, with a focus on disciplined
capital management and progression of its development pipeline.
The Company continued to progress its Selva Malvezzi development strategy, which represents the primary
source of near-term growth. Plans include the drilling of additional wells within the Selva Concession , including
the Casale Guida 1d, Ronchi 1d , Bagnarola1d and Selva Malvezzi-1d prospects.
During the period, a 3D geophysical survey was completed to refine subsurface understanding and optimise
future drilling locations. Environmental and regulatory approval processes for the expansion program
continued, with engagement ongoing with relevant Italian authorities.
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
6
In addition to Selva, the Company maintains a portfolio of exploration and development assets, including
Teodorico (offshore Adriatic) and other onshore exploration permits such as Cadelbosco di Sopra, Grattasasso
and Torre del Moro. These assets provide longer-term optionality for production growth.
Financial results for the year
During the reporting period, Po Valley Energy Limited maintained stable production performance from its Selva
Malvezzi gas field while advancing key development initiatives to support future growth. The Company
continues to operate as a low-cost, cash-generative onshore gas producer in Italy, with a focus on disciplined
capital management and progression of its development pipeline.
Production from the Group’s primary asset, the PM-1 well at Selva Malvezzi, remained consistent throughout
the year. Daily production rates averaged approximately 75,000 to 80,000 standard cubic metres per day,
resulting in total production for the year was 28,205 Mcm of gas (gross, net to the Group of 63% or 17,769
Mcm) generating revenue of €7 million for the Group. This sustained performance reflects stable reservoir
characteristics and effective field operations. The asset continues to provide a reliable base level of production
with minimal operational disruption.
The Company delivered continued positive operating cash flow across the reporting period supported by
steady production and favourable gas pricing conditions during parts of the year. Operating costs remained
tightly controlled. This cost discipline underpins the Company’s strong operating leverage and resilience to
commodity price movements.
The Company maintained a strong financial position, ending the period with cash and financial investments of
approximately €8 million and no debt. A portion of surplus liquidity was allocated to low-risk government bond
investments, reflecting a conservative treasury management approach.
The profit after tax for the year from continuing operations was €2,724,263 (2024: €2,391,151).
The Group’s cash reserves as at 31 December 2025 were €2,462,580 (31 December 2024: €4,993,913).
A review of the operations and the results of those operations of the Group during the year is as follows:
Summary of results table: 2025 2024
Mcm Mcm
Production volume (net) 17,769 17,364
€’000 €’000
Gas Sales 7,047 6,524
EBITDA1
4,482 4,004
Depreciation and amortisation – production (547) (532)
Depreciation (28) (27)
Unwind of discount of restoration provision (41) (39)
EBIT1
3,866 3,405
Finance income (costs) other than restoration provision discounting 19 (14)
Taxation (1,161) (1,000)
Net profit after tax attributable to shareholders 2,724 2,391
1EBITDA (earnings before interest, tax, depreciation and depletion, exploration expensed and impairment losses) and EBIT (earnings before
interest and tax) are non-IFRS measures that are presented to provide an understanding of the Group’s operations. The non-IFRS measures
are unaudited, however, the numbers have been extracted from the financial statements that have been subject to audit by the Company’s
auditor.
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
7
Share issues
There were no new shares issued in the financial year.
Earnings per share
The basic earnings per share for the Group from continuing operations was 0.24 € cents (2024: 0.21 € cents).
Operations
Selva Gas Field (63% PVO) - Selva Malvezzi Production Concession
The Selva Malvezzi Production Concession is an onshore natural gas asset in the eastern Po Plain, Bologna
province, Emilia-Romagna Region. Granted in July 2022, the 80.68 km² concession was carved out of the former
Podere Gallina Exploration Permit and includes the producing Podere Maiar gas field alongside nearby gas
prospects of Selva Malvezzi 1d, Casale Guida 1d, Ronchi 1d and Bagnarola 1d. Po Valley Operations Pty Limited
(‘PVO’), a wholly owned subsidiary of the Company, operates the concession and holds a 63% interest, with
the remaining 37% held by the Prospex Group.
Podere Maiar-1 (“PM-1”) gas facility and production:
Production has been consistent throughout the year averaging ~75,000-80,000 scm per day, with the exception
of days during which slick line operations were undertaken and/or brief scheduled production halts for routine
plant maintenance.
Routine slick line operations in the year confirmed pressure evolution as per expectations and there was no
sand or water detected during the slick lines. There also has not been any unexpected readings on surface
sand detection equipment during the year.
Gas is currently sold under the gas sales agreement (GSA) with Hera Trading S.r.l, a group entity headed by
Hera S.p.A with operational headquarters in the Bologna province. This partnership offers the Group an
opportunity to collaborate with local business and has strengthened its engagement with local community.
The 12-month contract with potential to extend commenced 1 October 2025, replaced the previous GSA with
BP Gas marketing. The Group completed 2 ½ successful years with partner BP Gas Marketing from its first gas
flow in July 2023 to 30 September 2025 delivering ~58.6 million scm (gross) of gas from PM1-d to BP Gas
Marketing.
Under the Hera GSA, the Group will deliver an estimated 27,9m scm (gross) in the 12 months with the gas
supply price linked to the Italian Gas Index (IG INDEX GME).
The table below summarises the production results for the year:
Podere Maiar-1 (PM-1) Production
Results
Mar 2025
Quarter
Jun 2025
Quarter
Sept 2025
Quarter
Dec 2025
Quarter
Dec 2025 Year
Avg. daily production (scm) [gross] 77,292 79,793 78,795 79,220 78,900
Quarterly production ('000 scm)
[net]
4,236 4,574 4,566 4,392 17,769
Weighted average price (per scm) €0.50 €0.39 €0.37 €0.33 €0.39
Revenue ('000) [net] €2,103 €1,805 €1,689 €1,450 €7,047
Field Operating costs ('000)1
€196 €126 €276 €146 €744
Note: All figures in the table above, other than the daily production rate, are quoted on a net-63% share to PVE
1.Cash outflows field operating costs per quarter excludes accrued royalties
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
8
Cumulative production since initial flow has reached 65.6million scm from the C2 level, equating to
approximately 95% of the certified P1 reserves reported in the July 2022 CPR (PVE’s net share is 63%).
Selva Malvezzi Prospects: Casale Guida 1d, Ronchi 1d, Bagnarola 1d, Selva Malvezzi 1d wells
The key area of focus for the Company with the next stages of development is at Casale Guida 1d (Selva North
discovery), Ronchi 1d (South Selva discovery), Selva Malvezzi 1d (East Selva prospect) and Bagnarola 1d
(Riccardina prospect) all of which are located within the Selva Malvezzi Production Concession.
The EIA covering the drilling, development, construction and production phases of the four wells filed in
December 2024 is presently under review in order to incorporate recommendations and amendments
received from the Ministry in order to update the project including the full scope of potential works and
impacts (treatment facilities, pipelines, Podere Maiar upgrade). The additional specialist studies requested by
the EIA commission are in progress and expected to be submitted to the Ministry in Q2 2026.
3D Geophysical survey
The Company completed the 3D geophysical data acquisition over the Selva Malvezzi concession area. The
program covered approximately 140 km². After laying out 8,380 wireless geophones, the data acquisition
commenced on 13 November 2025 using single sweeps from four vibroseis trucks operating simultaneously in
separate quadrants. The data acquisition was completed on time and under budget, benefitting from
unusually dry weather for November, but its success was driven by extensive planning and outstanding
execution by contractors, Geotec for permitting and Geofyzika Torun (GT) for acquisition & data recording,
and PVO technical team tight supervision.
The data acquired collated and prepared by GT for next data processing and interpretation over the next
quarter. This work will deliver a high-resolution three-dimensional subsurface model to support future field
development planning and potential resource upgrades at Selva Malvezzi. Schlumberger have been engaged
for this portion of work in February 2026. Subsequent interpretation of the data will be done in-house. The
Company is targeting communication of these results with the market in Q2/2026. The data acquired will be
instrumental in fine tuning the Company's 4 well development program in this license.
Teodorico Offshore Gas field development (100% PVO)
The Teodorico gas field is located in shallow waters (approximately 30m deep) off the east coast in the
northern Adriatic Sea; the primary source of domestic gas production for much of Italy; and in close proximity
to existing east coast offshore gas production facilities. Teodorico has the largest gas-in-place of all of Po Valley
Energy’s gas fields and is at an advanced stage of assessment, ready for development. The Group holds a
preliminary production concession for this area.
The Company has progressed the preparation of an updated new EIA addressing the additional requirements,
particularly in relation to the two environment protection areas that required further study following the
Regional Administrative Court (TAR) ruling in 2024. This new EIA study will incorporate the recommendations
of the Directorate of the Ministry of Environment, specifically addressing the protected areas that were not
included in the original submission because they were established after that time. PVO has sought further
information on technical requirements for Teodorico connection and gas treatment at the Naomi-Pandora
facility operated by ENI. The Company has commenced discussion with ENI and will evaluate outcomes and
impact on the EIA that is in progress. The Company plans to finalise and submit the updated EIA at the earliest
opportunity.
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
9
Torre del Moro, Cadelbosco di Sopra and Grattasasso exploration licences (100% PVO)
The Company is continuing reviewing optimal exploration and development paths for the other onshore
exploration assets (Cadelbosco di Sopra, Grattasasso and Torre del Moro), including the possibility of third-
party investors / partners interested in participating in their exploration and development. Cadelbosco di Sopra
and Grattasasso are shallow gas opportunities which fit neatly within the Company’s proven exploration and
development capabilities, whilst Torre del Moro is a large deep gas/condensate prospect. In addition, these
areas include oil contingent resources at Cadelbosco and Grattasasso discoveries as well as gas prospective
resources at Torre del Moro.
Health, safety and environment
Paramount to Po Valley’s ability to pursue its strategic priorities is a safe workplace and a culture of safety first.
The Group regards environmental awareness and sustainability as key strengths in planning and carrying out
business activities. Po Valley’s daily operations are conducted in a way that adheres to these principles and
management is committed to their continuous improvement. Whilst growing from exploration roots, the
Group has strived to continually improve underlying safety performance. The Group has adopted an HSE
Management System which provides for a series of procedures and routine checks (including periodical audits)
to ensure compliance with all legal and regulatory requirements and best practices in this area. In 2025, the
Group maintained its outstanding occupational health safety and environmental track record with no incidents
or near misses to report.
Principal risks and uncertainties
Oil and gas exploration and appraisal involves significant risk. The future profitability of the Group and the
value of the Company’s shares are directly related to the results of exploration and appraisal activities. There
are inherent risks in these activities. No assurances can be given that funds spent on exploration and appraisal
will result in discoveries that will be commercially viable. Future exploration and appraisal activities, including
drilling and seismic acquisition, may result in changes to current perceptions of individual prospects, leads and
permits.
The Group identifies and assesses the potential consequences of strategic, safety, environmental, operational,
legal, reputational and financial risks in accordance with the Group’s risk management policy. Po Valley
management continually monitors the effectiveness of the Group’s risk management, internal compliance and
control systems which includes insurance coverage over major operational activities, and reports to the Board
on areas where there is scope for improvement. The Board as a whole is responsible for oversight of the
Group’s risk management and control system. The principal risks and uncertainties that could materially affect
PVE’s future performance are described below.
External risks
Exposure to gas
pricing
Volatile gas prices make it difficult to predict future price movements with any
certainty. Decline in gas prices could have an adverse effect on PVE. The Group does
not currently hedge its exposures to gas price movements long term. The
profitability of the Group’s prospective gas assets will be determined by the future
market for domestic gas. Gas prices can vary significantly depending on other
European gas markets, worldwide supply and the terms under which long term take
or pay arrangements are agreed.
PO VALLEY ENERGY LIMITED
DIRECTORS’ REPORT
10
Changes to law,
regulations or
Government policy
Changes in laws and regulations or government policy may adversely affect PVE’s
business. Examples include changes to land access or the introduction of legislation
that restricts or inhibits exploration and production.
Similarly changes to direct or indirect tax legislation may have an adverse impact
on the Group’s profitability, net assets and cash flow.
Uncertainty of timing
of regulatory
approvals
Delays in the regulatory process could hinder the Group’s ability to pursue
operational activities in a timely manner including drilling exploration and
development wells, installing infrastructure, and to producing gas. In particular, oil
and gas operations in Italy are subject to both Regional and Federal approvals.
Operating risks
Exploration,
development and
production
The future value of PVE will depend on its ability to find, develop, and produce gas
that is economically recoverable. The ultimate success or otherwise of such
ventures requires successful exploration, establishment of commercial reserves,
establishment of and successful effective production from processing facilities, and
transport and marketing of the end product. Through this process, the business is
exposed to a wide variety of risks, including failure to locate hydrocarbons, changes
to reserve estimates or production volumes, variable quality of hydrocarbons,
weather impacts, facility malfunctions, lack of access to appropriate skills or
equipment and cost overruns.
Estimation of
reserves
The estimation of oil and natural gas reserves involves subjective judgments and
determinations based on geological, technical, contractual and economic
information. It is not an exact calculation. The estimate may change because of new
information from production or drilling activities.
Tenure security
Exploration licences held by PVE are subject to the granting and approval by
relevant government bodies. Government regulatory authorities generally require
the holder of the licences to undertake certain proposed exploration commitments
and failure to meet these obligations could result in forfeiture. Exploration licences
are also subject to partial or full relinquishments after the stipulated period of
tenure if