A European Gas Producer
6 September 2023
1
Important notices and disclaimer
DISCLAIMER
This presentation is for informational purpose only and does not constitute an offer to sell and should not be considered as an invitation or recommendation to purchase securities in Po Valley Energy Limited. Such
Offer can be made only through proper subscription documentation and only to investors meeting strict suitability requirements. Any failure to comply with these restrictions may constitute a violation of applicable
securities laws. In providing this presentation Po Valley Energy has not considered the financial position or needs of the recipient. Persons needing advice should consult their stockbroker, bank manager, solicitor,
attorney, accountant or other independent financial and legal advisors.
SUMMARY INFORMATION
This presentation contains summary information about the current activities of Po Valley Energy and its subsidiaries as at the date of this Presentation and does not purport to be all inclusive or to contain all
information which its recipients may require or purport to contain all the information required that an investor should consider when making and investment decision nor does it contain all the information which
would be required in a disclosure document or prospectus prepared in accordance with the requirements of the Corporations Act. It should be read in conjunction with Po Valley Energy’s other periodic and
continuous disclosure announcements lodged with the ASX which are available at www.asx.con.au/markets/company/pve. Neither Po Valley Energy nor its directors, employees or advisers give any warranties in
relation to the statements and information in this Presentation.. The views expressed within this document are solely those of Po Valley Energy Limited.
FORWARD LOOKING STATEMENTS
This presentation contains statements related to our future business and financial performance and future events or developments involving Po Valley Energy Limited (‘PVE’ or “the Company’) that may constitute
forward looking statements. All statements, other than statements of historical fact, that refer to any future oil and gas production, resources or reserves, exploration results and events that the Company expects to
occur are forward-looking statements. Although the Company believes the expectations in these forward-looking statements are based upon reasonable assumptions, such statements are not a guarantee of future
performance and actual results or developments may differ materially from the outcomes anticipated. This may be due to several factors, including market prices, exploration and exploitation success, and the
continued availability of capital and financing, plus general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance, and actual results
or performance may differ materially from those projected in the forward-looking statements. The Company does not assume any obligation to update or revise its forward-looking statements, whether as a result of
new information, future events or otherwise.
RESERVES AND RESOURCES
Po Valley Energy Limited (ASX:PVE) provides the following additional information to this Presentation:
1.
2.
3.
4.
The estimates of Reserves, Contingent and Prospective Resource included in the Presentation are estimates reported in the Competent Persons Report (CPR) dated 25 July 2022 issued by CGG Services UK Limited
(CGG) and as per the ASX announcement of 26 July 2022.
All estimates, except for those relating to Teodorico, have been determined using a deterministic method. Estimates for Teodorico have been determined using a probabilistic method.
Where reported, aggregated Reserves and Contingent Resources are aggregated by arithmetic summation by category.
In relation to Prospective Resources reported in the Presentation on slides 11, 14, 17,18 and 19
Prospective Resources are the estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These
estimates have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially
moveable hydrocarbons.
5.
The Company confirms it is not aware of any new information or data that materially affects the information included in the original market announcements referred to in this presentation and, in the case of
estimates for petroleum reserves, contingent resources and prospective resources, all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue
to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not materially changed from the original market
announcements.
2
Company overview
Po Valley Energy (ASX: PVE) is a
European gas producer with over 20
years-experience and a portfolio of
natural gas fields in northern Italy.
The Company currently has gas
production at its Podere Maiar 1
(PM-1) well, with look-alike wells to
come online in the next 18 months.
Po Valley is presently focused on the
onshore gas development of its Selva
Malvezzi asset. With the Podere Maiar 1
well
actively
producing
gas,
the
company plans to advance similar wells
at Selva North and South with drilling
expected in 2H 2024
Existing assets include producing &
development-ready gas fields
Key Licences in Italy
1. Selva Mavezzi
Production Concession
2. Teodorico
3. Torre del Moro
Teodorico
Offshore gas | Development
100% owned
2P Reserves of 37 Bcf and 2C Resource
of 10.6 Bcf
Located close to existing infrastructure
•
•
•
4. Cadelbosco
5. Grattasasso
Selva Malvezzi
•
•
•
•
Onshore gas | Production
63% owned
Net 2P Reserves of 8.4 Bcf and
2C Resource of 8.9 Bcf
PM-1 well currently producing
gas
Tie-in wells Selva North & South
wells to drilled in 2H 2024
Torre Del Moro
•
•
CGG CPR (July 2022). Refer to ASX Announcement 26 July 2022
Onshore gas | Exploration
100%-owned
Onshore gas exploration prospect
3
Corporate snapshot
Italian-focused gas producer, explorer, & developer is undergoing a consistent increase
in gas production revenue, which is strategically reinvested to drive progressive growth
Company Overview and Balance Sheet
Board of Directors
Share price (Close at 31 August 2023)
A$0.050
Kevin Bailey AM
Market Cap (31 Aug 2023)
A$57.9m
Shares on issue2
1,158.96m
Joseph Constable
Ticker
ASX:PVE
Cash at bank (30 June 2023)
$1.539m1
Debt
1.
Nil
Quarterly Activities Report 30 June 2023 2. Excludes 7,500,000 unlisted options with an
exercise price of A$0.10 and expiring 30 June 2024.
Chairman
Non-Executive Director
Sara Edmonson
Non-Executive Director (Rome)
Katrina O’Leary
Non-Executive Director
Share Price Chart – 12 Month
Major Shareholders
Kevin Bailey AM
23.69%
Michael Masterman
18.84%
Beronia Investments & Associates
10.23%
Paul Lambert & Associates
6.93%
Directors and Management
26.72%
4
Investment highlights
Uniquely positioned in the attractively priced Italian domestic gas market, with
producing & development-ready onshore gas assets and an experienced team in
bringing gas to market on the ground in Italy.
STRATEGICALLY WELL POSITIONED
•
To take advantage of the current
attractively priced gas market in
Italy, as the country moves toward
greater energy security
PRODUCING & REVENUE GENERATING
•
•
•
PM-1 last reported producing at
~72,000scm/d1
Low-cost production
Gas sold to BP Gas Marketing under an
18-month supply agreement
1 Refer to ASX Announcement 7 August 2023
HIGHLY CREDIBLE ITALIAN TEAM
•
Management team with strong
local connections and prior
experience bringing gas
developments into production in
Italy
PVE’s gas production
at Selva is low-cost,
with 100% of the gas
being sold to BP Gas
MATERIAL NEAR TERM UPSIDE
Marketing under an
• Increasing gas production at PM-1
18-month supply
will assist funding of a series of
agreement
development and exploration
•
opportunities across its five licenses
in Italy
Reserves and resources attributed,
provide near term upside potential
5
PVE Team is Delivering
The Board and Management team are delivering the Podere Maiar 1 well on schedule
2021
2022
2023
Grant of Environmental Approvals
Accelerated regulatory approvals
✓
✓
✓
Begin construction of Podere Maiar surface development at Selva ✓
✓
Tendering for Gas Sales Agreements (GSA’s)
Award of production concession at Selva Malvezzi concession
Award of Gas Sales Agreement
✓
Secure first gas production at the Podere Maiar-1 development
Progress geology and geoscience (“G&G”) work programmes on
Selva North, South and East
✓
6
Highly experienced board and executive
Kevin Bailey AM
Sara Melinda Edmonson
Non-Executive Director
Non-Executive Director
Non-Executive Director
Katrina O'Leary
Brent Bonadeo
Kevin was appointed as a
director on 22 April 2016 and
chairman on 29 April 2022. He
has been a shareholder of the
Company since April 2008 and
brings significant business
acumen and experience to the
Board. Kevin is a highly
successful businessman with
a range of business interests,
both local and overseas. He
has served as a director of
numerous various entities
including
the
Investment
Advisory Board of the TimorLeste Petroleum Fund, the
$17bn sovereign wealth fund of
Timor-Leste.
Sara has extensive experience in
natural
gas,
the
critical
transition fuel for a low carbon
future, having led PVE from July
2010 to 2017. She is currently the
President
at
Associazione
Energia Nazionale, an Italian
association created to promote
sustainable
production,
transportation and use of
domestic energy and is fluent in
Italian, having previously worked
both in Italy and internationally
for Ernst & Young Transaction
Advisory Services. During her
tenure at EY Sara advised
numerous blue-chip corporate
clients on transactions in Russia,
Romania, Turkey and the US.
Joseph was appointed as a
director on 30 November 2021.
Joseph
is
an
executive
director of Hancock & Gore
(ASX: HNG), and portfolio
manager at H&G Investment
Management Limited. He has
been a long-term shareholder
of PVE personally as well as
professionally via the H&G
High
Conviction
Fund
(formerly
The
Supervised
Fund). Joseph brings his
significant financial skills to
PVE and the board of
directors.
Katrina was appointed as a
director on 2 May 2022. Katrina
is an Intellectual Property (IP)
and Information Technology
(IT) lawyer with experience in
both commercial and litigious
matters. Katrina brings to the
board
her
strength
in
compliance, governance, and
risk management.
Brent was appointed to the
executive
team
as
a
consultant in June 2022. Brent
brings significant experience
in the execution of business
development
and
growth
initiatives including complex
transactions, mergers and
acquisitions,
financings,
divestments
and
joint
ventures. Brent has sector
experience in oil and gas,
energy
and
power,
infrastructure,
resources,
industrial and technology.
Brent is very familiar with the
PVE asset suite and Italian
management team.
Chairman
Joseph Constable
Consultant
7
Industry leading, locally based
management team
Mr Giorgio Bertuzzi
Exploration & New Projects
Manager
Giorgio
has
31
years’
experience with ENI/Agip,
covering numerous roles:
Exploration
Manager
in
northern Italy, Prefeasibility
Studies Manager, in Italy;
Exploration, Planning and
Control in Western and
Eastern Africa.
Gianluca De Rosa
Pier Paolo Poncia
Gianluca
joined
the
Company in 2008. He has
over 18 years’ experience in
the oil and gas industry.
Formerly employed for 10
years at Eni in the exploration
department,
Gianluca
acquired
an
expert
knowledge of all frameworks
of
upstream
activities,
working on onshore/offshore,
gas and deep oil prospects
Pier Paolo originally joined
the Company in 2010. He is a
geologist with 25 years
experience
in
structural
engineering
monitoring,
cartography and oil and gas
exploration & development,
GIS and cartography.
Before joining Po Valley
Operations,
Pier
Paolo
worked
for
engineering
companies, specifically in
structural monitoring in the
largest Italian transportation
infrastructures.
Senior Geophysicist &
Team Leader
Senior Geologist
Diego Balistreri
Development and
Production Manager
Diego Balistreri graduated with a
qualification
in
Petroleum
Engineering from the Politecnico
di Turin. His oil and gas career
started in 1978 with Italian major
ENI, before joining Elf Aquitaine
and Enterprise Oil. Diego has
extensive experience in the
development and production of
several oil and gas fields in Italy,
Norway and France. In 2011 he
joined Po Valley and has been
responsible for the development
of the Sillaro, Bezzecca and
Vitalba gas fields. He is presently
acting as ‘Development and
Production Manager’ for the
Podere Maiar gas field in the
Selva
Malvezzi
Production
Concession.
Daria Fortunati
Geologist Production
Manager
An experienced Geologist &
Production Manager that is
knowledgeable with Italian
compliance
reporting,
external and government
relations.
8
Portfolio of High-Quality Gas Assets
Suite of Italian gas assets, offering revenue producing assets, near term development and
longer-term appraisal/exploration upside
A pipeline of production, development
and exploration opportunities at its five
licenses in Italy.
The principal licences of PVO are:
1: The Selva Malvezzi Production Concession.
Within the Selva Malvezzi Production
Concession are the Podere Maiar gas field,
the gas prospects known as Fondo Perino,
East Selva, Riccardina, Selva B North and
Selva B South.
2: The AR94PY licence, located offshore
Adriatic northern Italy, contains the d40ACPY
Exploitation Concession with the Teodorico
gas field and the PL3-C gas prospect.
3: The Torre del Moro licence containing the
Torre del Moro gas prospect.
4: The Cadelbosco licence containing the
Zini (Qu-B), Zini (Qu-A), Canolo (Qu-A) and
Canolo Pliocene gas prospects.
9
PM-1 – The First Development
10
Selva Malvezzi – Podere Maiar 1 well
(PM-1) on production
Supplying gas at low cost into the attractively priced Italian domestic gas market
•
Onshore gas development asset located in the eastern part of
the Po Plain, Italy
•
63%-owned by Po Valley, 37% Prospex Oil & Gas (includes
acquired UOG interest)
•
Production commenced on July 4 2023 1
•
Po Valley‘s late 2017 drilling program intersected two identified
gas reservoirs, C1 and C2, in the Medium-Upper Pliocene sands
•
Total net pay 41m across C1 and C22
•
C1: flow rate of 129,658 scm/d (3/8“ choke)2
Picture: Nitrogen tanks at Podere Maiar – 1 well site
•
C2: flow rate of 148,136 scm/d (3/8“ choke)2
Ownership (PVE)
•
Gas plant capacity is ~150,000 scm/day
•
Pipeline capacity is ~300,000 scm/day
•
Gas produced from PM-1 meets the requirements for the SNAM
grid with minimal processing from its surface plant facilities
1.
2.
Refer ASX announcement 5 July 2023
Refer to ASX Announcement 19 January 2018.
63%
Reserves (2P, net attributable)
8.4 Bcf
Resources (2C, net attributable)
8.9 Bcf
Resources (Best Prospective, net attributable)
55.5 Bcf
First gas
2Q 2023
Capital expenditure (net attributable)
€2.2m*
Source: CGG CPR (July 2022). Refer to ASX Announcement 26 July 2022
* Refer to ASX Announcement 11 August 2022
11
PM-1 Low-Cost Gas Supply
Selva is a repeatable and proven low-cost gas play. PM-1 is well number 25 with the
potential for North, South and East to follow in accordance with PVE’s G&G program
Key CGG ‘Competent Persons Report’1 results
•
Average Daily Production 80,000scm
•
Operating costs are estimated to be approximately
€0.6MM per year
•
PM-1 gas plant has base production capacity of 150,000
scm/d and is easily expanded
•
Low risk 2C resources at Selva could double the current
forecast 2P production profile
•
Selva North and South (2km’s to PM-1) and Selva East
(5km’s to PM-1) are achievable near-term tie in
opportunities
•
Selva North and South are PM-1 “lookalikes”
•
Selva East and Riccardina higher risk, benefit from 3D
•
Selva is an attractive field for gas storage
1 -CGG CPR (July 2022). Refer to ASX Announcement 26 July 2022
Key Gas Sales Agreement2 Terms
•
PVE has an offtake agreement with BP International
subsidiary BP Gas Marketing Limited to supply gas
from its Podere Maiar-1 facility in Italy
•
18-month contract to commence on 1 April 2023 with
potential to extend at the end of this period
•
Under the contract PVE supplies more than 37,000,000
standard cubic metres of gas
•
•
12,142,200 scm for the thermal year ending 30 Sep 2023 (6 months)
•
24,970,400 scm for the thermal year ending 30 Sep 2024 (12
months)
The gas supply price is linked to Italy’s “Heren PSV day
ahead mid” price assessment (Dutch TTF spot price
which is publicly available and is considered a useful
proxy by PVE)
2 –Refer ASX Announcement 14 February 2023
12
PM-1 Strong Realised Prices and
Production
European Gas Prices remain elevated
•
Gas Sales Price from PM-1 is linked to Italy’s “Heren PSV day ahead
mid” price assessment (the Dutch TTF price which is publicly
available is considered a useful proxy by PVE)
•
JV: PVE 63% and Prospex (PXEN:LSE) 37%. As announced to ASX on
7th August production at PM-1 post commissioning recommenced
at 72,000scmpd (2.54mmscf/day), until all data analysis is
complete
•
With gas production commencing 4 July 2023 and ramp-up and
commissioning concluding 4 August 2023, PVE expects initial gas
production cashflows before the end of August 20231
•
Dutch TTF Gas Price (October Contract) – Euro/TWh
Margins are expected to be high with capital and production costs
considered low
Note on Conversion Euro/MWh to A$/GJ. Current TTF price is circa 35.75 euro per
MWh. Divide by 3.6 to convert to GJ = 9.93 euro per GJ. AUD/EUR circa 1.67 = A$16.59
per GJ (A$17.50 per Mcf). Compares to the current East Coast Australian spot price
of A$10.97/GJ2
Source: ICE
1.
2.
Refer ASX announcement 5 July 2023
https://aemo.com.au/aemo/apps/visualisations/gsh-benchmark-price.html
Dutch TTF Gas Price (Futures Contracts) – Euro/TWh
13
PM-1 unlocks Selva Malvezzi upside
potential – look alike prospects
Selva levels A+B Prospects
(2C Contingent Resource: 14.1 Bcf gross)
• Stratigraphic pinch-out prospects
proved viable by successful Podere
Maiar-1 well
• Level A and B sands in mid-Pliocene
reservoir
Riccardina prospect
(Prospective Resource (best): 38.8 Bcf gross)
• Lower pliocene sand target
• Riccardina-1 well did not hit the structure
• Structural trap on the footwall of a back
thrust associated to Selva main thrust
Podere Maiar well
(2P Reserve: 13.4 Bcf gross)
• Producing well
• Revenue generating
in
East Selva prospect
(Prospective Resource (best): 34.8 Bcf gross)
• Podere Maiar - 1 Well proved the concept
that this prospective resource is based on
the same play of Selva trend
14
Asset Portfolio – More Upside to
Come
15
Favourable market and regulatory
environment supports growth
•
Prior to the Ukraine War, Italy imported ~90% of its natural gas
supply1 and currently has no nuclear capability and 2
operational coal plants. 20% of Italy’s energy is from
renewable sources (as of 2020)1
•
The Italian government plans to reduce reliance on Russian
gas by 20252, ~29 Bcm of Russian gas per year from the start
of 20221,2
•
Mario Draghi said Italy must, “increase domestic production
at the expense of imports, because gas produced in your own
country is more manageable and can be cheaper”2
•
The domestic gas price increased >10x as a result of the
market changes, from a pre-Russia ~€0.2/scm to a high of
~€2.20 /scm in 3Q 20223.
•
1
2
The result of this energy shortage and price spike, has been
the creation of a much more favourable regulatory,
government and pricing environment for domestic gas
projects in Italy. PVE is very well positioned to take
advantage of this opportunity, with an experienced team in
place and development-ready gas fields
https://www.thelocal.it/
https://www.bloomberg.com/
3
https://www.theice.com/
Italy imported 92% of
gas consumption
Algeria
600
Bcf
152
Bcf
Russia
897 Bcf
Libya
Source: BP Statistical Review of World Energy, 67th Edition (June 2018)
Note: All figures are as at the end of 2017
Supply sourced from
bottom quartile
countries on the
political stability index
for the World Bank
Governance
Indicators
16
Development Ready Assets - Reserves
and Resources*
Gas (net Bcf)
Licence
AR94PY
Reserves
Project
Teodorico
Teodorico
PL3-C
Selva Malvezzi
(Net)**
Selva (PM-1)
Level A South
Level B North
Level B South
1P
27
2.6
2P
37
8.4
3P
48
18.8
Contingent Resources
Prospective Resources
1C
2C
3C
Low
Best
High
7.4
10.6
14.0
7.9
15.9
25.0
0.7
2.2
0.6
1.1
5.6
2.2
2.3
11.2
5.9
18.3
8.2
6.4
21.9
24.4
9.2
25.6
81.2
12.9
0.6
1.4
2.4
420.7
502.0
596.1
East Selva
Riccardina
Fondo Perino
Cadelbosco di Sopra Zini (Qu-B)
Canolo (Qu-A)
Canolo (Piliocene)
Zini Qu-A
Torre Del Moro
Torre del Moro
1.1
0.7
0.4
*Reserve and Resource estimated are as reported in CPR report dated 25 July 2022 (Refer ASX announcements 26 July 2022)
**Net to the Company’s 63% economic interest in Selva Malvezzi
2.7
1.1
3.6
4.6
1.7
10.5
17
Selva Malvezzi – tie-in opportunities
nearby to infrastructure and capacity
SNAM pipeline with capacity only 1km from Podere Maiar well site
•
Selva Malvezzi a very low cost onshore natural gas
developments
•
SNAM SpA, Italy’s gas network company, owns the
connection to the domestic gas grid
•
Po Valley constructed a gas plant and pipeline on
site to connect to the SNAM grid
•
Gas plant capacity of ~150,000 scm/day
•
Pipeline capacity of ~300,000 scm/day
•
Gas produced meets the requirements for the SNAM
grid with minimal processing from surface plant
facilities
•
Ability to repeat for lookalike targets – Selva North,
Selva South, Selva East and Riccardina and Fondo
Perino.
•
In total follow up targets (net) of 8.9 Bcf 2C and 55.5
Bcf (Best) Prospective Resources.
Picture: Tie-in to pipeline just 1,000 m away from Podere Maiar well site
18
Teodorico – another development
ready asset
Teodorico is Po Valley‘s largest scale asset and is ready for development pending final
production concession approvals
Overview
•
Offshore gas development asset located in the shallow waters of the Adriatic Sea (d40 AC
PY), 40km north-east of Ravenna (refer Reserves and Resources comments in Appendix)
o 100%-owned by Po Valley Energy
o Total licence area of 65.9km2
•
Environmental Impact Assessment (EIA) approval in March 2021
•
118km2 of 3D seismic and well data has been since acquired from Eni S.p.A
•
Teodorico contains two gas discoveries drilled and tested by the former operator Eni S.p.A
o
Carola 1: discovery well drilled in 1986 to 2,620m and recorded flow rates of 62,000
scm/d (1/4“ choke)
o
Irma 1: drilled in 1988 to 2,572m and recorded flow rates of 131,000 scm/d (5/16“ choke)
Future Development Plan
•
Developed with 2 production wells in 30m water depth
•
Located 12 miles offshore from Ravenna (refer Reserves and Resources slide)
•
Competitive capex total (€67.2m)
•
Ministry approved development plan for tie-in to the nearby Naomi-Pandora platform (operated by
Eni S.p.A) through a 12km long pipeline
•
Naomi-Pandora will pipe the gas to the Casalborsetti gas terminal using existing infrastructure
Source: CGG CPR (July 2022); Refer to ASX Announcement 26 July 2022
Picture: AR 94 PY Exploration Permit & d40 AC PY Production
Concession
Ownership
100%
Reserves (2P, attributable)
37 Bcf
Resources (2C, attributable)
10.6 Bcf
Prospective (Best, attributable)
15.9 Bcf
First gas (target)
Q2 2025
Capital expenditure
€67.2m
19
Major activity timeline
Quarter
4Q 2023
1Q 2024
2Q 2024
3Q 2024
4Q 2024
1H 2025
2H 2025
2025+
PM-1 Gas Production and cash flow
Selva Seismic Survey Shoot
Ministry Authorization for drilling Selva
North, South, East
Selva North & South drilling (est.)
Selva North & South production
(contingent upon success)
Selva East drilling (est.)
Teodorico – asset realisation program
Key execution assumptions include:
•
•
•
G&G studies (preliminary) at Selva North, South and East planned and budgeted
Selva North and South drilling timing is an estimate only. No budget, post PM-1 gas
Teodorico asset realisation programme ongoing in conjunction with Italian authorities and other stakeholders
20
Investment summary
Strongly positioned with
a highly experienced
management team to
capture the opportunities
offered by the booked
resources and available
capacity and strong
demand for domestic gas
production in Italy
Selva Production ramp
up providing strong cash
flows
Revenue from PM-1 to
provide opportunities to
reinvest in growth
opportunities
Growth Portfolio
with development and
exploration upside
potential to support
future growth
Exploration partnership
opportunities across
assets including asset
realization program at
Teodorico
Strong Market
conditions with
growing demand for
domestic gas supply
and existing
infrastructure capacity
On the ground team with
prior experience in the
PVE assets and with
bringing gas to market in
Italy
21
CONTACT US
Po Valley Energy Ltd
Kevin Bailey AM
Chairman
+61 (0) 417 556 458
Chairman@povalley.com
Suite 8, 7 The Esplanade
Mt Pleasant, WA 6153
Australia
www.povalley.com
info@povalley.com
22