PVE- Conference Investor Presentation
Released
Released
Announcement PDF
Investor
Presentation
A European Gas Producer
September 2024
1
Important notices and disclaimer
DISCLAIMER
This presentation is for informational purpose only and does not constitute an offer to sell and should not be considered as an invitation or recommendation to purchase securities in Po Valley Energy Limited. Such
Offer can be made only through proper subscription documentation and only to investors meeting strict suitability requirements. Any failure to comply with these restrictions may constitute a violation of applicable
securities laws. In providing this presentation Po Valley Energy has not considered the financial position or needs of the recipient. Persons needing advice should consult their stockbroker, bank manager, solicitor,
attorney, accountant or other independent financial and legal advisors.
SUMMARY INFORMATION
This presentation contains summary information about the current activities of Po Valley Energy and its subsidiaries as at the date of this Presentation and does not purport to be all inclusive or to contain all
information which its recipients may require or purport to contain all the information required that an investor should consider when making and investment decision nor does it contain all the information which
would be required in a disclosure document or prospectus prepared in accordance with the requirements of the Corporations Act. It should be read in conjunction with Po Valley Energy’s other periodic and
continuous disclosure announcements lodged with the ASX which are available at www.asx.con.au/markets/company/pve. Neither Po Valley Energy nor its directors, employees or advisers give any warranties in
relation to the statements and information in this Presentation.. The views expressed within this document are solely those of Po Valley Energy Limited.
FORWARD LOOKING STATEMENTS
This presentation contains statements related to our future business and financial performance and future events or developments involving Po Valley Energy Limited (‘PVE’ or “the Company’) that may constitute
forward looking statements. All statements, other than statements of historical fact, that refer to any future oil and gas production, resources or reserves, exploration results and events that the Company expects to
occur are forward-looking statements. Although the Company believes the expectations in these forward-looking statements are based upon reasonable assumptions, such statements are not a guarantee of future
performance and actual results or developments may differ materially from the outcomes anticipated. This may be due to several factors, including market prices, exploration and exploitation success, and the
continued availability of capital and financing, plus general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance, and actual results
or performance may differ materially from those projected in the forward-looking statements. The Company does not assume any obligation to update or revise its forward-looking statements, whether as a result of
new information, future events or otherwise.
RESERVES AND RESOURCES
Po Valley Energy Limited (ASX:PVE) provides the following additional information to this Presentation:
1.
2.
3.
4.
5.
The estimates of Reserves, Contingent and Prospective Resource included in the Presentation are estimates reported in the Competent Persons Report (CPR) dated 25 July 2022 issued by CGG Services UK Limited
(CGG) and as per the ASX announcement of 26 July 2022 and are pre-production reserves.
All estimates, except for those relating to Teodorico, have been determined using a deterministic method. Estimates for Teodorico have been determined using a probabilistic method.
Where reported, aggregated Reserves and Contingent Resources are aggregated by arithmetic summation by category.
In relation to Prospective Resources reported in the Presentation on slide 7 and 11:
Prospective Resources are the estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These
estimates have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially
moveable hydrocarbons.
The Company confirms it is not aware of any new information or data that materially affects the information included in the original market announcements referred to in this presentation and, in the case of
estimates for petroleum reserves, contingent resources and prospective resources, all material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not materially changed from the original
market announcements.
2
Company overview
Po Valley Energy (ASX: PVE) is a
European gas producer with over 20
years-experience and a portfolio of
natural gas fields in northern Italy.
The Company currently has gas
production at its Podere Maiar 1
(PM-1) well in the Selva Malvezzi
Production concession.
Po Valley is presently focused on the
onshore gas development of its Selva
Malvezzi asset. With the Podere Maiar 1
well
actively
producing
gas,
the
Company is advancing work programs
across other prospects at Selva North,
South, East and Riccardiana.
Existing assets include producing &
development-ready gas fields
Key Licences in Italy
1. Selva Malvezzi
Production Concession
2. Teodorico
3. Torre del Moro
Teodorico
Offshore gas | Development
100% owned
2P Reserves of 37 Bcf and 2C Resource
of 10.6 Bcf1
Located close to existing infrastructure
•
•
•
4. Cadelbosco
5. Grattasasso
Selva Malvezzi
•
•
•
•
Onshore gas | Production
63% owned
Net 2P Reserves of 8.4 Bcf and
2C Resource of 8.9 Bcf 1 ,2
PM-1 well currently producing
gas
North, South & East Selva and
Riccardina advanced work
programme for future
development
Torre Del Moro
Onshore gas | Exploration
•
•
100%-owned
Onshore gas exploration prospect
1. CGG CPR (July 2022). Refer to ASX Announcement 26 July 2022
2. 2P reserves at Selva stated before production to date of ~23million scm – Refer to Annual Report and June 2024 Quarterly report: ASX releases 30 April
2024 and 30 July 2024
3
Investment highlights
Uniquely positioned in the attractively priced Italian domestic gas market, with
producing & development-ready onshore gas assets and an experienced team in
bringing gas to market on the ground in Italy.
STRATEGICALLY WELL POSITIONED
HIGHLY CREDIBLE ITALIAN TEAM
PRODUCING & REVENUE GENERATING
MATERIAL NEAR TERM UPSIDE
•
•
•
•
To take advantage of the current
attractively priced gas market in
Italy, as the country moves toward
greater energy security
PM-1 gas production is low-cost with
100% of the gas sales being sold to BP
Marketing.
Strong and steady production
Attractive gas prices
•
•
•
Management team with strong
local connections and prior
experience bringing gas
developments into production in
Italy
Increasing gas production at PM-1
will assist funding of a series of
development and exploration
opportunities across its five licenses
in Italy
Reserves and resources attributed,
provide near term upside potential
4
Production analysis
•
•
•
•
•
•
1
2
PM-1 PRODUCTION OUTCOMES
PM-1 last reported producing at ~80,000scm/d1
Production Q2/24 6,835,397 scm (PVE share 63% 4,306,300 scm)1
Revenues Q2/24 total €2.3m (PVE share 63% €1.45m)1
Low-cost production
Cumulative production since first gas to Q2/24 ~23million scm2
Positive outlook for near term project breakeven
Chart 2: Average Daily Production (scm/day)
Refer to June 2024 Quarterly report: ASX release 30 July 2024
Refer to Annual Report and June 2024 Quarterly report: ASX releases 30 April 2024 and 30 July 2024
Chart 3: Average Gas price from first gas to June 2024
Chart 1: Breakeven analysis of PM-1 – Revenue and costs on 100% gross basis
Chart 4: Production volumes, revenues and costs from first gas to June 2024
5
PM-1 unlocks Selva Malvezzi upside
potential – look alike prospects
Selva levels A+B Prospects
(2C Contingent Resource: 14.1 Bcf gross) 1
• Stratigraphic pinch-out prospects
proved viable by successful Podere
Maiar-1 well
• Level A and B sands in mid-Pliocene
reservoir
Podere Maiar well
(2P Reserve: 13.4 Bcf gross)1
• Producing well
• Revenue generating
in
CPR
Riccardina prospect
(Prospective Resource (best): 38.8 Bcf gross) 1
• Lower pliocene sand target
• Riccardina-1 well did not hit the structure
• Structural trap on the footwall of a back thrust
associated to Selva main thrust
East Selva prospect
(Prospective Resource (best): 34.8 Bcf gross) 1
• Podere Maiar - 1 Well proved the concept
that this prospective resource is based on
the same play of Selva trend
Prospective Resources are the estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both
an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
1. Reserves and Resources Net to PVE are 63% of the gross
amounts shown above : Podere Maiar Well Net 8.4 Bcf 2P
Reserve (pre-production), Selva A and B 8.9 Bcf 2C
Contingent Resource, East Selva 21.9 Bcf Prospective
Resource, Riccardina 24.4 Bcf Prospective Resource
CGG CPR (July 2022) Refer to ASX Announcement 26 July 2022
PVE Team is Delivering
The Board and Management team continue to deliver on Selva Projects
2023
Award of Gas Sales Agreement
Secured first gas production at the Podere Maiar-1 development
Progress geology and geoscience (“G&G”) work programmes on
Selva North, South, East and Riccardina
2024
Maintain steady production at Podere Maiar-1 generating cash
revenue
Advance work programmes on Selva North, South, East and
Riccardina
3D-Seismic campaign over the whole production concession
Envionmental Studies, drilling program planning and applications
✓
✓
✓
✓
✓
In progress
In progress
7
Investment summary
Strongly positioned with
a highly experienced
management team to
capture the opportunities
offered by the booked
resources and available
capacity and strong
demand for domestic gas
production in Italy
Selva Production
providing strong cash
flows
Revenue from PM-1 to
provide opportunities to
reinvest in growth
opportunities
Growth Portfolio
with development and
exploration upside
potential to support
future growth
Exploration partnership
opportunities across
assets including asset
realization program at
Teodorico
Strong Market
conditions with
growing demand for
domestic gas supply
and existing
infrastructure capacity
On the ground team with
prior experience in the
PVE assets and with
bringing gas to market in
Italy
8
Appendices
9
Corporate snapshot
Italian-focused gas producer, explorer, & developer is undergoing a consistent increase
in gas production revenue, which is strategically reinvested to drive progressive growth
Company Overview and Balance Sheet
Share price (Close at 21 August 2024)
A$0.036
Market Cap (15 August 2024)
A$40.56m
Shares on issue
1,158.96m
Ticker
ASX:PVE
Cash at bank (30 June 2024)
$4.98m1
Debt
1.
Nil
Quarterly Activities Report 30 June 2024
Board of Directors
Kevin Bailey AM
Joseph Constable
Chairman
Non-Executive Director
Sara Edmonson
Non-Executive Director (Rome)
Katrina O’Leary
Non-Executive Director
Share Price Chart – 12 Month
Major Shareholders
Kevin Bailey AM
24.84%
Michael Masterman
18.52%
Beronia Investments & Associates
10.31%
Paul Lambert & Associates
7.01%
10
Table of Reserve and Resources*
* Gas Reserves and Resources by Field (as per CPR dated 25 July 2022 ASX announcement 26 July 2022) less depletion from PM1 production at 31 December 2023 per the Annual
Report.
Licence
Project
Reserves
Contingent Resources
1C
2C
3C
Low
Best
High
Selva level A South
0.7
1.1
2.3
Selva Malvezzi
Selva level B North
2.2
5.6
11.2
[Net]
Selva level B South
0.6
2.2
5.9
Fondo Perino
6.4
9.2
12.9
East Selva
18.3
21.9
25.6
Riccardina
8.2
24.4
81.2
7.9
15.9
25.0
0.6
1.4
2.4
420.7
502
596.1
Selva (Podere Maiar1)*
Teodorico
AR94PY
Teodorico
1P
2P
3P
2.38
8.18
18.58
Prospective resources
27
37
48
7.4
10.6
14.0
PL3-C
Zini (Qu-B)
1.1
2.7
4.6
Cadelbosco
Canolo (Qu-A)
0.7
1.1
1.7
di Sopra
Canolo (Plioc)
0.4
3.6
10.5
Zini (Qu-A)
Torre del Moro Torre del Moro
Prospective Resources are the estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both
an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
The Company confirms it is not aware of any new information or data that materially affects the information included in the original market announcements referred to in this announcement and, in the case of estimates
for petroleum reserves, contingent resources and prospective resources, all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have
not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not materially changed from the original market announcement.
11
Highly experienced board
Kevin Bailey AM
Chairman
Kevin was appointed as a director
on 22 April 2016 and chairman on
29 April 2022. He has been a
shareholder of the Company since
April 2008 and brings significant
business acumen and experience
to the Board. Kevin is a highly
successful businessman with a
range of business interests, both
local and overseas. He has served
as a director of numerous various
entities including the Investment
Advisory Board of the Timor-Leste
Petroleum
Fund,
the
$17bn
sovereign wealth fund of TimorLeste.
Sara Melinda Edmonson
Joseph Constable
Katrina O'Leary
Non-Executive Director
Non-Executive Director
Non-Executive Director
Sara was appointed as director on
23 December 2019. Sara has
extensive experience in natural
gas, the critical transition fuel for a
low carbon future, having led PVE
from July 2010 to 2017. She is a
former President of Associazione
Energia
Nazionale,
an
Italian
association created to promote
sustainable
production,
transportation and use of domestic
energy. She fluent in Italian, having
previously worked both in Italy and
internationally for Ernst & Young
Transaction
Advisory
Services.
During her tenure at EY Sara
advised
numerous
blue-chip
corporate clients on transactions in
Russia, Romania, Turkey and the US.
Joseph was appointed as a
director on 30 November 2021.
Joseph is an executive director of
Hancock & Gore (ASX: HNG), and
portfolio
manager
at
H&G
Investment Management Limited.
He
has
been
a
long-term
shareholder of PVE personally as
well as professionally via the H&G
High Conviction Fund (formerly The
Supervised Fund). Joseph brings
his significant financial skills to PVE
and the board of directors.
Katrina was appointed as a
director on 2 May 2022. Katrina is
an Intellectual Property (IP) and
Information Technology lawyer
with decades of experience in IP
management, commercial and
litigious matters. Katrina also
advises
on
ESG
compliance
especially in the area of ethical
sourcing.
Her
practice
is
international - and she has worked
in Italy, the USA and Australia
representing
government
and
international organisations and
major public companies. Katrina
brings to the board her strength in
legal compliance, governance, and
risk management..
12
Industry leading, locally based management team
Mr Giorgio Bertuzzi
Exploration & New Projects
Manager
Giorgio has 31 years’ experience
with ENI/Agip, covering numerous
roles: Exploration Manager in
northern
Italy,
Prefeasibility
Studies
Manager,
in
Italy;
Exploration, Planning and Control
in Western and Eastern Africa.
Gianluca De Rosa
Pier Paolo Poncia
Gianluca joined the Company
in 2008. He has over 18 years’
experience in the oil and gas
industry. Formerly employed
for 10 years at Eni in the
exploration
department,
Gianluca acquired an expert
knowledge of all frameworks of
upstream activities, working on
onshore/offshore, gas and
deep oil prospects
Pier Paolo originally joined the
Company in 2010. He is a
geologist
with
25
years'
experience
in
structural
engineering
monitoring,
cartography and oil and gas
exploration & development,
GIS and cartography.
Before
joining
Po
Valley
Operations, Pier Paolo worked
for engineering companies,
specifically
in
structural
monitoring in the largest
Italian
transportation
infrastructures.
Senior Geophysicist & Team
Leader
Senior Geologist
Diego Balistreri
Development and Production
Manager
Diego Balistreri graduated with a
qualification
in
Petroleum
Engineering from the Politecnico
di Turin. His oil and gas career
started in 1978 with Italian major
ENI, before joining Elf Aquitaine
and Enterprise Oil. Diego has
extensive
experience
in
the
development and production of
several oil and gas fields in Italy,
Norway and France. In 2011 he
joined Po Valley and has been
responsible for the development
of the Sillaro, Bezzecca and
Vitalba gas fields. He is presently
acting as ‘Development and
Production Manager’ for the
Podere Maiar gas field in the Selva
Malvezzi Production Concession.
Daria Fortunati
Geologist Production
Manager
An experienced Geologist &
Production Manager that is
knowledgeable with Italian
compliance reporting, external
and government relations.
13
CONTACT US
Po Valley Energy Ltd
Kevin Bailey AM
Chairman
+61 (0) 417 556 458
Chairman@povalley.com
Level 5, 191 St. Georges Terrace
Perth WA 6000
www.povalley.com
info@povalley.com
14
Share your feedback